- 10 - 12/2020
Copyright © 2020, F ast ČR, a.s.
When it is absolutely necessary to have live power supply going in to the appliance while
servicing the appliance, it is necessary to install a permanent device in the most critical
point to detect leakage so that adangerous situation is averted.
Special attention must be paid to ensuring that as aresult of the work performed on
electrical components the cover is not changed to the extent of affecting the level of
protection. T his must also include damage to cables, excessive number of connections
and terminals not performed according to original specifications, damaged gaskets,
incorrect configuration of plugs, etc.
It is necessary to ensure that the appliance is mounted safely .
It is necessary to ensure that gaskets or sealing materials are not damaged in such
away tha t they no longer ser ve to preven t the entry of aflammable atmosphere. Spare
parts must conform to the manufacturer‘sspecifications.
NOTE The use of silicone gaskets and seals may suppress the efficiency of certain
type of leak detection devices. Intrinsically safe components do not need to be
disconnected prior to being worked on.
3. Repairs of intrinsically safe components
No permanently inductive or capacitative load may be placed on the circuit without it
being ensured that thereby the permitted voltage and curr ent for the used appliance
is not exceeded.
Intrinsically safe components are the only type on which it is possible to work in
aflammable envir onment even while under live current. T esting equipment must have
correct specifications.
Parts are replaced using only parts specified by the manufacturer . Different parts could
result in ignition of refrigerant upon leakage into the environmen t.
4. Cabling
Check that cabling is not exposed to wear and tear , corrosion, excessive pressure,
vibrations, sharp edges or any other negative en vironmental effects. This check must
also take into consideration the effects of ageing and permanent vibrations from
sources such as compressors or fans.
5. Detection of ammable refrigerants
Under no circumstances may potential sourc es of ignition be used for locating or
detecting refrigerant leaks.
Ahalogen burner (or any other type of detector utilising an open flame) must not be
used.
6. Leak detection methods
The following leak detection methods are considered ac ceptable for systems
containing flammable refrigerants.
For the detection of flammable refrigerants , electronic leak detectors must be used,
however their sensitivity may not be appropriate or they ma y require recalibration.
(Detection equipment must be calibrated in an area without any refrigerant pr esent).
It is important to ensure that the detector is not a potential ignition source and that
it is suitable for the used refrigerant. The leak detector must be set to a percentage of
LFL refrigerant and must be calibrated for the used r efrigerant and the respective gas
percentage is confirmed (maximum 25 %).
Leak detection liquids are suitable for use on most refrigerants , however , detergents
containing chlorine must be excluded since chlorine may react with the refrigerant
and corrode copper pipes.
In the event of asuspected leak, all open flames must be removed/extinguished.
In the event that the refrigerant leak is found and requir es hard soldering, then all
the refrigerant must be drained from the system or separ ated (by closing a valve) in
apart of the system distant from the leak. The system must then be cleaned out using
oxygen-free nitrogen (OFN) both bef ore as well as after the hard soldering process.
7. Collection and pump discharge
In the event that the cooling circuit is breached due to r epairs – or for any other reason
– conventional proc edures must be followed. It is, howev er, important to adhere to the
best method due to flammability. It is necessary to adhere to the following pr ocedure:
■ collect the refrigerant;
■ clean out the circuit using inert gas;
■ pump out;
■ again clean out using inert gas;
■ open the circuit by cutting or hard soldering.
The contents of the circuit must be collected into c orrect collection c ylinders. The
system must be „flooded“ with OFN (ox ygen-free nitrogen) f or the unit to remain
safe. It may be necessary to repeat the procedur e several times. For this task, neither
compressed air nor oxygen may be used.
Flooding may be achieved by disrupting the vacuum in the sy stem with the use of
OFN, and by continued filling until the operating pressur e is achieved, then venting
into the atmosphere and finally lowering to a vacuum. This process must be repeated if
refrigerant still remains in the system. When the last OFN cartridge is used, the system
must be ventilated to atmospheric pressur e to enable work to be performed. This
activity is absolutely necessary if hard soldering is to be per formed on the pipes.
It is necessary to ensure that the vacuum pump outlets are not nearby to any ignition
source, and ventilation must be pr ovided.
8. Filling procedur e
Apart from conventional filling procedur es, also the following requirements must be
adhered to.
– I t is necessary to ensure that no contamination by various refrigerants oc curs when
the filling device is used. Hoses or pipes must be as short as possible to minimise the
amount of refrigerant contained inside of them.
– Cylinders must be held vertically.
– It is important to ensure that the cooling system is gr ounded prior to being filled
with refrigerant.
– When filling is complete , the system must be marked with alabel (if it does not have
one already).
– It is necessar y to pay extreme care to ensur e that the cooling system is not overfilled.
A pressure test using OFN must be performed before r efilling the system. In the case
of a leak , the system must be tested after being refilled but also bef ore being put
into operation. A verification test must be performed before leaving the installation
location.
9. T aking out of operation
Prior to performing this procedure it is essential that the technician fully acquain ts
him/herself with the device and all its particulars. Correct practice of safely collecting
all refrigerant is recommended. P rior to performing this activit y, oil and r efrigerant
samples must be taken if an analysis is required prior to using the using the
regenerated refrigerant f or the first time. It is essential that prior to starting this ac tivity
that electricity is available.
a) Acquain ting one‘sself with the device and its activity.
b) Electrical disconnection of the system.
c) Prior to starting the procedure, ensure that:
■ if required, mechanical device for handling the cylinder with refrigerant is available;
■ all personal protective devices are available and used corr ectly ;
■ the collection process is constantly under the supervision of acompetent person;
■ the collection device and cylinders comply with respective norms.
d) Pump out the cooling system if possible.
e) If achieving vacuum is not possible, collection pipes are created to enable the
collection of refrigerant from various parts of the system.
f ) Ensur e that the cylinder is placed on the scale before the collection of refrigerant is
started.
g) The collection device is turned on and runs according to the
manufacturer‘sinstructions.
h) Cylinders are not overfilled. (No more than 80 % of liquid content capacity).
i) The maximum operating pressure of the cylinder is not exceeded, ev en temporarily.
j) When the c ylinders are properly filled up and the procedur e is complete, ensure that
the cylinders and devices are immediately removed from the installa tion location
and that all the separation valves on the device are closed .
k) The collected refrigerant must not be filled into adifferent cooling syst em until it is
cleaned and checked.
10. Marking with alabel
The appliance must be marked with a label indicating that it has been put out of
operation and is without refrigerant. The label must be dated and signed. It is ensured
that there are labels on the appliance indicating that it con tains flammable refrigerant.
11. Collection
When the refrigerant is collected from the system, either due t o ser vicing or when it is
put out of operation, it is recommended to adhere t o proper practice and safely collect
all the refrigerant.
When the refrigerant is transferred in to the cylinders, it is necessary to ensure that
appropriate cylinders for collecting refrigerant are used.
It is necessary to ensure that there is a sufficient number of cylinders available to
contain the complete contents of the sy stem. All the cylinders that are to be used must
be intended for collecting refrigerant and be marked with a label for this refrigerant
(i.e. special cylinders for collecting refrigerant). The cylinders must be complete with
a safety valve and associated closing valves in good working condition. The empty
collection cylinders are pumped empty and if possible cooled prior to collecting
refrigerant.
The collection device must be in good operating condition with a set of manuals
relating to the device, which ar e on hand and it must be suitable for collecting
flammable refrigerants. Apart from this, a set of calibrated scales in good operating
condition must also be available. Hoses must be complete with c ouplers without
seepage and in good condition. Prior to using the collection device, check that it is in
satisfactory operating condition, has been properly maintained and all the associated
electrical components are sealed to prevent ignition in the ev ent of refrigerant being
released. If in any doubt, consult the manufacturer .
The collected refrigerant must be returned to the refrigeran t supplier in the correct
collection cylinder and with arespectively arranged waste transport letter . Refr igerants
are not to be mixed in the collection units and especially not in the cylinders.
In the event that compressors or compressor oils ar e to be collected, ensure that they
are pumped out to an acceptable level in or der to ensure that flammable refrigerant
does not remain in the lubricant. The pump discharge process must be performed
before the compressor is r eturned to the supplier. T o speed up this process, only
electrically heated compressor elements may be used. When the oil is drained from
the system, it must be disposed of safely .