587699
20
Zoom out
Zoom in
Previous page
1/28
Next page
10
Fall on condensation pipe
at least
2% fall
The standard condensation hose is
for connection to the left side (as
viewed from the front).
All electrical installation
work should be performed by
specialist contractors. Isolate the
voltage supply when connecting
the electrical terminals.
CAUTION
Tightness check
Once all the connections have
been established, the pressure
gauge station is attached as
follows to the Schrader valve (if
fitted):
red = small valve
= injection pressure
blue = large valve
= suction pressure
Once connected, perform a
tightness test using dried nitrogen.
The tightness test involves
spraying a leak detection spray
onto the connections. If bubbles
are visible, the connections have
not been properly made. Re-
tighten the connection or prepare
a new flange.
If the tightness test is successfully
completed, depressurise the
refrigerant pipes and start a
vacuum pump with an absolute
final partial pressure of min. 10
mbar to remove the air in the pipe.
Any humdity present in the pipes is
also removed.
A vacuum of min. 20 mbar
abs. must be created!
CAUTION
The time required to generate
the vacuum is dependent on
the pipework volume of the
indoor unit and the length of the
refrigerant pipes. This always takes
at least 60 minutes.
Once any foreign gases and
humdity have been completely
extracted from the system, the
valves on the pressure gauge
station are closed and the valves
on the outdoor component are
opened as described in the chapter
on "Commissioning".
Condensation connection
If the temperature falls below the
dew point, condensation will form
on either the vaporiser in cooling
mode or the liquefier in heating
mode.
The collection tray below the
vaporiser should be connected to
the drain.
The lower panelling on the
outdoor component acts as a
collection tray. Use the supplied
condensation connection for this
purpose.
The condensation pipe should
have a fall of min. 2 % (Fig
10). This is the responsibility
of the customer. If necessary,
fit vapour diffusion tight
insulation.
The condensation pipe from
the unit should run freely
into the drainage pipe. If the
condensation runs directly
into a sewer pipe, fit a trap to
prevent any unpleasant odours.
When operating the unit at
outdoor temperatures below
0 °C, ensure the condensation
pipe is laid to protect it against
frost. The lower panelling
on the housing should also
be protected against frost to
ensure condensation can drain
off at all times (responsibility of
customer).
If necessary, fit supplementary
pipe heating.
Once the pipe has been laid,
check the condensation drains
off and permanently seal it.
Electrical connection
A protected mains supply and
control cable should be connected
to the outdoor component and
indoor unit respectively.
We recommend that customers
install a main/repair switch
in the vicinity of the outdoor
component.
If an optional condensation
pump is used in conjunction
with the unit, it may be
necessary to install an
additional relay with a higher
contact rating after the switch-
off contact on the pump to
switch off the compressor.
Control cables should be
screened if laid in areas exposed
to strong magnetic fields..
Details concerning the electrical
protection of the system are
given in the section on technical
data.
REMKO ML
20
20


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for REMKO ML 351 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of REMKO ML 351 in the language / languages: English as an attachment in your email.

The manual is 4,3 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of REMKO ML 351

REMKO ML 351 User Manual - German - 28 pages

REMKO ML 351 User Manual - Dutch - 28 pages

REMKO ML 351 User Manual - French - 28 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info