587907
29
Zoom out
Zoom in
Previous page
1/44
Next page
29
Commissioning must be carried
out only by an authorised
installation company or factory
customer service engineers.
The following steps must be
carried out prior to commissioning:
1. Check all connections and
unions of the unit and gas
connection for tightness.
2. Check all accessible electrical
screw-type and plug connectors.
3. Check the electrical connection
for polarity and the mains
supply (230V/50Hz).
4. Check that the unit is
professionally connected to an
effective earthing system in
accordance with the applicable
safety standards.
Only when this is provided,
is electrical safety and reliable
function of the unit ensured.
5. Check that the electronic
temperature control ATR-6 is
correctly connected.
The units are delivered preset
at the factory depending on the
required type of gas.
The complete unit must be
checked for correct functioning
and tightness of all gas
connections.
ATTENTION
ATTENTION
Gas pipes must never be
used for earthing electrical
equipment!
Commissioning
It must be ensured that a gas
supply pressure conforming to
standards is constantly available
depending on the type of gas
available locally.
The supplied gas must correspond
to the gas category set on the unit.
The procedure for commissioning
the burner is as follows:
1. Loosen the screwed cap in the
pressure measuring connection
of the burner.
Do not unscrew fully!
2. Connect a suitable pressure
gauge, e.g. U-tube manometer,
minimum resolution 0.1 mbar.
3. Open the gas shut-off devices.
4. Switch on the main/emergency
switch.
5. Adjust the room temperature
setting on the temperature
control ATR-6 to a higher
value than the existing room
temperature.
6. Set the mode selector switch
on the front of the unit to the
position “Heat”.
7. Set the temperature control to
“MANUAL MODE”.
8. Check that the heating symbol
lights up on the temperature
control display.
9. Adjust the heat demand
temperature higher than the
temperature measured by the
room thermostat or temperature
control.
A small fl ame lighting up on the
display shows that the burner is
switched on.
It is possible that the ignition
burner does not ignite fi rst time
due to the presence of air in the
gas pipe, so that the unit generates
a fault.
The unit must be reset and the
starting procedure repeated.
Only authorised specialists
may make adjustments and
carry out maintenance work on
the unit and gas burner.
ATTENTION
Combustion analysis
Start the burner and after
switching on the fan bring the
burner to “maximum output” by
pressing and holding the reset
button on the front of the unit for
2 to 3 seconds.
Operation at maximum output is
indicated by the green LED on the
front of the unit fl ashing once.
Ensure that the gas pressure
upstream of the gas valve
corresponds to the prescribed
value, otherwise regulate.
After about two minutes, connect
a gas analyser to the chimney pipe
and read off the CO2 value.
Compare this value with the values
in the “Gas settings“ table for the
type of gas used.
s
s
s
29


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for REMKO GPM 35 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of REMKO GPM 35 in the language / languages: English as an attachment in your email.

The manual is 4,39 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of REMKO GPM 35

REMKO GPM 35 User Manual - German - 44 pages

REMKO GPM 35 User Manual - Dutch - 44 pages

REMKO GPM 35 User Manual - French - 44 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info