805733
68
Zoom out
Zoom in
Previous page
1/96
Next page
9.3 Disposal and recycling
Caution
Only qualified professionals are permitted to remove and dispose
of the boiler, in accordance with local and national regulations.
If you need to remove the boiler, proceed as follows:
1. Switch off the boiler.
2. Cut the power supply to the boiler.
3. Close the main gas valve.
4. Close the water mains.
5. Close the gas valve on the boiler.
6. Drain the installation.
7. Remove the air/flue gas pipes.
8. Disconnect all pipes.
9. Dismantle the boiler.
10 Troubleshooting
10.1 Error codes
The Gas 320/620 Ace is fitted with an electronic regulation and control
unit. The heart of the control is a e-Smart microprocessor, which controls
and also protects. In the event of an error, a corresponding code is
displayed.
Tab.70 Error codes are displayed at three different levels
Code Type Description
A .00.00 (1) Warning The controls continue to operate, but the cause of the warning must be investigated. A
warning can change into a blocking or lock-out.
H .00.00 (1) Blocking The controls will stop normal operation, and will check with set intervals if the cause of
the blocking still exists.(2) Normal operation will resume when the cause of the blocking
has been rectified. A blocking can become a lock-out.
E .00.00 (1) Lock out The controls will stop normal operation. The cause of the lock-out must be rectified and
the controls must be reset manually.
(1) The first letter indicates the type of error.
(2) For some blocking errors, this checking interval is ten minutes. In those cases, it may seem that the controls do not start automatically.
Wait ten minutes before resetting.
The meaning of the code can be found in the various error code tables.
Important
The error code is needed to find the cause of the error quickly and
correctly and for any support from Remeha.
10.1.1 Display of error codes
When an error occurs in the installation, the control panel will show the
following:
Fig.98
MW-3000179-03
10 Troubleshooting
68 7734324 - v.06 - 01102021
68


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Remeha Gas 320 Ace at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Remeha Gas 320 Ace in the language / languages: English as an attachment in your email.

The manual is 6.49 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Remeha Gas 320 Ace

Remeha Gas 320 Ace Usermanual and installation guide - German - 104 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info