805745
20
Zoom out
Zoom in
Previous page
1/84
Next page
Condensation
Direct connection of the flue gas outlet to structural ducts is not
permitted because of condensation.
If condensate from a plastic or stainless steel pipe section can flow back
to an aluminium part in the flue gas outlet, this condensate must be
discharged via a trap before it reaches the aluminium.
Newly installed aluminium flue gas pipes with longer lengths can
produce relatively larger quantities of corrosion products. Also casting
sand and processing metal chips from new boilers can fill the boiler trap
on short term after installation. Check and clean the trap more often for
these reasons.
4.6 Requirements for the electrical connections
Establish the electrical connections in accordance with all current local
and national regulations and standards.
Electrical connections must only be made by qualified installers, and
only while the power supply is disconnected.
The appliance is completely pre-wired. Never change the internal
connections of the control panel.
Always connect the appliance to a well-earthed installation.
The wiring must comply with the instructions in the electrical diagrams.
Follow the recommendations in this manual.
Separate the sensor cables from the 230 V cables
Make sure the following requirements are met when connecting the cables
to the CB and SCB connectors:
Tab.19 PCB connectors
Wire cross section Stripping length Tightening torque
solid wire: 0.14 – 4.0 mm² (AWG 26 – 12)
stranded wire: 0.14 – 2.5 mm² (AWG 26 – 14)
stranded wire with ferrule: 0.25 – 2.5 mm² (AWG 24 – 14)
8 mm 0.5 N⋅m
4.7 Water quality and water treatment
The quality of the heating water must comply with the limit values in our
Water quality instructions. The guidelines in these instructions must be
followed at all times. In many cases, the boiler and central heating system
can be filled with normal tap water and water treatment will not be
necessary.
4 Before installation
20 7837114 - v.01 - 10012023
20


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Remeha Gas 210 Ace at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Remeha Gas 210 Ace in the language / languages: English as an attachment in your email.

The manual is 6.15 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info