805745
12
Zoom out
Zoom in
Previous page
1/84
Next page
Tab.3 Specific devices delivered with the Gas 210 Ace boiler
Name visible
in display
Software ver
sion
Description Function
CU-GH13 2.0 Control unit CU-GH13 The CU-GH13 control unit handles all basic functionality of the
Gas 210 Ace boiler.
MK3 1.94 Control panel HMI T-control The HMI T-control is the user interface to the Gas 210 Ace
boiler.
SCB-01 1.3 Expansion PCB SCB-01 The SCB-01 provides a 0-10 V connection for a PWM system
pump and two potential-free contacts for status notification.
SCB-02 1.3 Expansion PCB SCB-02 The SCB-02 provides functionality for a DHW and central
heating zone, a 0-10 V connection for a PWM system pump
and two potential-free contacts for status notification.
GTW-
Bluetooth
- Gateway BLE Smart Antenna The BLE Smart Antenna provides functionality to connect the
boiler to an app via Bluetooth.
4 Before installation
4.1 Installation regulations
Important
The Gas 210 Ace must be installed by a qualified installer in
accordance with local and national regulations.
Warning
The installer must be registered with Gas Safe and have the
correct ACS qualifications.
Important
Practical guidelines - see the latest version.
4.2 Location requirements
Danger
It is forbidden to store, even temporarily, combustible products
and substances in or near the boiler.
Caution
The boiler must be installed in a frost-free area.
An earthed electrical connection must be available close to the
boiler.
A connection to the drain must be present for the condensate
drain close to the boiler.
When choosing the best installation location, consider:
The regulations.
The required installation space.
The required space around the boiler for good access and to facilitate
maintenance.
The permitted position of the flue gas outlet and/or air supply opening.
4 Before installation
12 7837114 - v.01 - 10012023
12


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Remeha Gas 210 Ace at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Remeha Gas 210 Ace in the language / languages: English as an attachment in your email.

The manual is 6.15 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info