805745
14
Zoom out
Zoom in
Previous page
1/84
Next page
Important
Flush the heating system with a volume of water equivalent to at
least three times the volume of the system.
Flush the domestic hot water pipes with at least 20 times the
volume of the pipes.
Important
Due to the presence of an aluminium heat exchanger, suitable
chemicals and the correct use of these chemicals should be
discussed with specialist water treatment companies.
4.4 Requirements for the gas connection
Carry out any welding work required at a safe distance from the boiler.
Before installing, check that the gas meter has sufficient capacity. Take
into account the consumption of all appliances. Notify the local energy
company if the gas meter has insufficient capacity.
We recommend installing a gas filter to prevent clogging of the gas
valve unit.
4.5 Requirements on the flue gas discharge system
4.5.1 Classification
Important
The installer is responsible ensuring that the right type of flue
system is used and that the diameter and length are correct.
Always use connection materials, roof terminal and/or horizontal
flue terminal supplied by the same manufacturer. Consult the
manufacturer for compatibility details.
The use of flue systems from other manufacturers is allowed in
addition to the recommended manufacturers listed in this
manual. Use is only allowed when all our requirements are met
and the description of flue system C63 is respected.
Tab.4 Type of flue system: B23P
Principle Description Recommended manufactur
ers(1)
AD-3001055-01
Room-ventilated version.
Without down-draught diverter.
Flue gas discharge via the roof.
Air supply from the installation area.
The air inlet connection of the boiler must stay open.
The installation area must be vented to ensure sufficient air
supply. The vents must not be obstructed or shut off.
The IP rating of the boiler is lowered to IP20.
Connection material and roof
terminal:
Alukan
Burgerhout
Cox Geelen
Muelink & Grol
(1) The material must also satisfy the material property requirements from the relevant chapter.
4 Before installation
14 7837114 - v.01 - 10012023
14


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Remeha Gas 210 Ace at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Remeha Gas 210 Ace in the language / languages: English as an attachment in your email.

The manual is 6.15 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info