595354
8
Zoom out
Zoom in
Previous page
1/53
Next page
8 GB
Before beginning, verify the steel cable
6
is
wound around the drum
3
correctly and the
clearance between the turns is smaller than the
steel cable (Fig. B).
Before using
Mounting (see Fig. C)
Secure the cable hoist to a square pipe / boom
using the 2 mounting brackets
1
. The dimensi-
ons of the square pipe / boom must correspond
with the size of the mounting bracket
1
and
must be able to bear double the rated load.
Note: We recommend contact a qualified
technician for this purpose.
Screw the mounting brackets
1
to the cable
hoist (also see Fig. C).
Tighten all screws.
Note: A qualified technician should inspect
the anchor of the square tube / boom before
putting the device into service.
Note: The cable hoist motor
14
is equipped
with a thermostat switch. The motor
14
may
there-
fore stop whilst operating the cable hoist; it will
automatically restart once it has cooled down.
Setting up the pulley function
(see Fig. D–G)
The cable hoist is equipped with a pulley
15
and
an additional hook
16
. When used correctly, the
cable hoist can lift double the load.
Install the pulley
15
and additional hook
16
as shown in figures D–G.
Hook the fixed hook
8
into the fixing opening
2
(see Fig. G). The load will now be lifted with
two steel cables and the cable hoist can there-
fore lift double the load.
Operation
Putting the cable hoist
into service
The user must hoist the load from the ground at
the slowest possible speed. The cable must be
tightened when the load is being hoisted.
Secure the device with a 10 A fuse or a 10 A
earth leakage circuit breaker to protect the
electric circuit.
Before beginning, verify the steel cable
6
is
wound around the drum
3
correctly and the
clearance between the turns is smaller than the
steel cable (Fig. B).
Remove the adhesive tape from the cable drum
3
prior to first use.
Ensure the load is properly secured to the hook
8
or, for pulley operation, the additional hook
16
, and always maintain a distance to the
load and the steel cable
6
.
Operating the cable hoist
Check if the emergency stop switch
9
is
pressed.
Turn the emergency stop switch
9
clockwise
to release.
Press the push button ▲
10
to hoist the load
(see Fig. H).
Press the push button ▼
10
to lower the load
(see Fig. H).
Auto-stop mechanism lever
5
When the maximum hoisting height has been
reached,
the shut-off weight
7
will push the lever
5
up
ward.
This engages a limit switch and the load can no
longer be hoisted.
Maximum cable length lever
4
When the load reaches the lowest possible position,
an end switch is activated, preventing the load from
being lowered further. This end switch also prevents
the cable hoist from being operated in the wrong
direction (hook moving opposite of the direction
indicated on the push button
10
).
Operation / Cleaning, maintenance and ordering spare parts / Disposal
Safety notices specific to the device / Before using / Operation
100684_par_Seilhebelzug_content_PL_SI_SK_NL.indd 8 02.07.14 12:41
8


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Parkside PSZ 250 B2 - IAN 100684 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Parkside PSZ 250 B2 - IAN 100684 in the language / languages: English, German, Dutch, Polish as an attachment in your email.

The manual is 6,15 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info