532606
10
Zoom out
Zoom in
Previous page
1/16
Next page
been pressed.
8. Cleaning, maintenance and
ordering of spare parts
Always pull out the mains power plug
before starting any cleaning work.
8.1 Cleaning
Keep all safety devices, air vents and the
motor housing free of dirt and dust as far as
possible. Wipe the equipment with a clean
cloth or blow it with compressed air at low
pressure.
Clean the equipment immediately after you
use it.
Clean the equipment regularly with a moist
cloth and some soft soap. Do not use
cleaning agents or solvents; these could
attack the plastic parts of the equipment.
Ensure that no water can seep
into the device.
8.2 Servicing
Important. Always ensure that the machine
is not connected to the mains supply before
you start any servicing work.
In the following: One cycle means one
raising and lowering movement of a load.
Periodic inspection means an inspection
after 100 cycles.
Test periodically that the limit switches on
the cable hoist are in correct working order.
(Test without a load) Conduct this test as
follows: When the cable has reached the
maximum height, the lever on the
automatic stopping mechanism (5) will be
actuated. The motor (14) must then stop.
When the steel cable (6) has been
unwound as far as possible, the lever for
the maximum cable length (4) will be
actuated. The motor (14) must then stop.
Inspect the mains cable (12) and the
control cable (13) periodically.
The steel cable (6) and return roller (15)
must be greased every 200 cycles.
A check must be made every 30 cycles, as
shown in Fig. 4, to find whether the entire
steel cable (6) is in good condition. If it is
damaged, it must be replaced by a steel
cable of the type specified in the technical
data.
Check every 1000 cycles whether the
screws for the fastening bars (1) and return
roller (15) are properly tightened.
Check every 1000 cycles whether the
hooks (8/16) and return roller (15) are in
good condition.
Check before using the cable hoist whether
the Emergency Stop switch (9) and
pushbuttons (10) are in perfect working
order.
Check the braking system every 1000
cycles. If the motor (14) makes any unusual
noises or cannot raise the rated load, it is
possible that the braking system requires
an overhaul:
- Replace damaged or worn parts and keep
the service documentation relating to this in
a safe place.
- Please contact an authorized service
center for any unscheduled maintenance
work.
8.3 Ordering replacement parts:
Please quote the following data when ordering
replacement parts:
Type of machine
Article number of the machine
Identification number of the machine
For our latest prices and information please go
to www.isc-gmbh.info
9. Disposal and recycling
The unit is supplied in packaging to prevent its
being damaged in transit. This packaging is
raw material and can therefore be reused or
can be returned to the raw material system.
The unit and its accessories are made of
various types of material, such as metal and
plastic. Defective components must be
disposed of as special waste. Ask your dealer
or your local council.
GB/
IE
10
Anleitung_LB6_2255124:_ 31.05.2011 10:25 Uhr Seite 10
10


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Parkside PSZ 250 A2 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Parkside PSZ 250 A2 in the language / languages: English as an attachment in your email.

The manual is 2,46 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Parkside PSZ 250 A2

Parkside PSZ 250 A2 User Manual - German, Dutch, French - 32 pages

Parkside PSZ 250 A2 User Manual - Italian, Spanish - 40 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info