532606
9
Zoom out
Zoom in
Previous page
1/16
Next page
GB/
IE
9
advice from a qualified technician. All screws
must be tightened correctly. A qualified
technician should check the anchoring of the
rectangular tube / swing arm before the
machine is started.
6.3 Block and tackle function (Fig. 6 – 9)
The cable hoist is fitted with a return roller (15)
and an additional hook (16). If these parts are
used correctly, the cable hoist can lift twice its
rated load.
Fit the return roller (15) and additional hook
(16) as shown in Figure 6 – 8. The permanent
hook (8) must be attached to the fastening hole
(2) (Fig. 9).
The load is now raised by two steel cables,
which means that the cable hoist can lift twice
its rated load.
7. Operation
7.1 Starting up
Remove the adhesive tape from the drum
(3) before using the hoist for the first time.
The value of the A-rated noise emissions at
the operatorʼs position is less than 70 dB.
Supply voltage: 230 V ± 10%, 50 Hz ± 1%.
The cable hoist must be operated in
ambient temperatures of between 0°C and
40°C with a relative humidity of less than
85%. Height above sea level: max. 1,000
m.
The temperature for transport and storage
may be between -25°C and 55°C. The
maximum temperature must not exceed
70°C.
The user should lift the load off the ground
at the slowest possible speed. The cable
should be taut when the load is raised.
The motor (14) for the cable hoist is fitted
with a thermostat switch. Whilst the cable
hoist is operating, the motor (14) may
therefore stop. It will restart automatically
when it has cooled down.
The electric cable hoist is not fitted with a
rated power limiter. You should therefore
not repeat attempts to lift a load if the
overload trip is limiting the hoistʼs
operation. In this case the load exceeds the
rated capacity of the cable hoist.
Do not leave any suspended loads
unsupervised without first taking the
appropriate safety precautions.
Fit the machine with a 10 A fuse or a 10 A
residual current operated circuit breaker
(RCCB) to protect the circuit
Do not use the lever (4/5) as a routine
stopping device. It should only be used to
stop the machine in an emergency.
Before you start, ensure that the steel cable
(6) is correctly wound around the drum (3)
and that the spacing between the windings
is smaller than the steel cable (Fig. 3)
Ensure that the load is correctly secured to
the hook (8) or, if you are using the block
and tackle, the additional hook (16) and
always maintain a safe distance from the
load and the steel cable (6).
7.2 Operation (Fig. 9-10)
Check whether the Emergency Stop switch
(9) is pressed. Turn the Emergency Stop
switch clockwise to release it.
Press the pushbutton (10) to raise the
load.
Press the pushbutton (10) to lower the
load.
Automatic stop mechanism lever (5): When
the maximum lifting height has been
reached, the cut-out weight (7) presses the
lever (5) upwards. This trips a limit switch
after which the load cannot be raised any
further.
Lever for maximum cable length (4): When
the load has reached its lowest possible
position, a limit switch is tripped which
makes it impossible to lower the load any
further. This limit switch also prevents the
cable hoist operating in the wrong direction
(hook moving in the opposite direction to
the arrow shown on the pushbutton).
The cable hoist will stop if the Emergency
Stop switch (9) is pressed.
In an emergency, immediately press the
Emergency Stop switch (9) to stop the
cable hoist. The cable hoist cannot be
operated if the Emergency Stop switch has
Anleitung_LB6_2255124:_ 31.05.2011 10:25 Uhr Seite 9
9


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Parkside PSZ 250 A2 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Parkside PSZ 250 A2 in the language / languages: English as an attachment in your email.

The manual is 2,46 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Parkside PSZ 250 A2

Parkside PSZ 250 A2 User Manual - German, Dutch, French - 32 pages

Parkside PSZ 250 A2 User Manual - Italian, Spanish - 40 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info