744061
41
Zoom out
Zoom in
Previous page
1/55
Next page
41 GB/MT
Preparing for use
Push the coupler (see Fig. A) onto the recharge-
able battery pack
9
. Insert the mains plug
into the socket.
The red charge indicator LED
15
indicates that the
charging process has started. The red light goes out
as soon as the battery pack
9
is fully charged.
The green charge indicator LED
16
shows that
the charging process is complete and the
battery pack
9
is ready for use.
NOTE: If the rechargeable battery pack is discharg
ed
and still hot from from the tool being used, it will not
be recharged immediately. The charging process
will start automatically, as soon as the rechargeable
battery pack has cooled to an adequate temperature.
Do no
t use the quick-charge process to charge
a battery pack
9
for a second time in close
succession. Otherwise there is the danger that
the battery pack
9
will become overcharged
and its useful life and that of the charger reduced.
Switch the charger
14
off for at least 15 min-
utes between successive charging processes.
To do this pull the mains plug out of the socket.
Inserting / removing the battery
pack into / out of the device
Removing the rechargeable battery pack:
In or
der to remove the rechargeable battery,
turn the appliance 180°.
Press the unlocking button
8
and push the re-
chargeable battery pack
9
out of the appliance.
Inserting the rechargeable battery pack:
Push t
he rechargeable battery pack
9
onto
the appliance.
Checking the battery
charge state
Press the battery charge state test button
3
.
The remaining charge capacity is shown on the
LED display
2
.
2-speed gear operation
In first gear (gear selector switch
1
in
position: 1)
the device achieves a speed of approx. 500 min
-1
and a high torque. For example, for screwing work
with small screw diameters.
In second gear (gear selector switch
1
in
position: 2)
the device achieves a speed of approx. 1800 min
-1
and a lower torque. For example, for rapid drill
progress in masonry or large drill or screw diameters.
Torque preselection
Use the torque preselection ring
13
to set the torque.
When this set torque is reached the clutch decouples
the drive. This allows you to screw in screws to a
predetermined depth, which is ideal e.g. for screw-
ing in a series of screws.
Select a lo
wer setting for small screws or soft
materials.
Select a high se
tting for large screws, hard ma-
terials, or when screwing out screws.
F
or drilling tasks select drilling setting by placing
the torque preselection ring in the
position.
Drilling / screwing /
impact drilling
Drilling / screwing:
Turn the setting ring
12
to the symbol .
Impact drilling:
T
urn the setting ring
12
to the symbol .
Changing inserted tools
Your cordless hammer drill has a fully automatic spindl
e
lock
and is fitted with a single-sleeve drill chuck
with radial lock “Made in Germany” by
.
Once the motor has come to a halt, the drive shaft
is automatically locked so that the quick-action drill
41


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Parkside PSBS 24 A1 IAN 64192 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Parkside PSBS 24 A1 IAN 64192 in the language / languages: English, Portuguese, Spanish as an attachment in your email.

The manual is 0,98 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Parkside PSBS 24 A1 IAN 64192

Parkside PSBS 24 A1 IAN 64192 Usermanual and installation guide - German, Dutch, French, Italian - 45 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info