458602
35
Zoom out
Zoom in
Previous page
1/175
Next page
3 Installation
3-4 FrameSaver NP 110 Users Manual - Installation Guide 980-001-0240B
November
2000
Power
Connections
The FrameSaver NP 110 has an AC Power Input Connector, Switched AC Output
Connector and a Frame Ground Connection Screw.
NOTE: For electrical safety and ensured shielding it is recommended that a wire con-
nection (min. 16-gauge wire) be made between the Frame Ground Connection Screw
(Figure 3-2) and an appropriate earthing connection. Make this connection before
applying power to the unit.
FrameSaver NP
110
Power
1. The FrameSaver NP 110 includes an internal universal Power Supply. Plug the
IEC 320 end of the Power Cord into the AC Power Input connector on the rear of
the FrameSaver NP 110, shown in Figure 3-2.
Fi
g
ure 3-2 FrameSaver NP 110 Power Connection
Power On
Self Test
2. Verify that the proper voltage (100 - 240 VAC, 50 - 60 Hz) is present at the outlet
to be used. If the outlet voltage is correct, plug the other end of the Power Cord
into the AC outlet.
3. Once connected, the FrameSaver NP 110 will go through the following normal
power up sequence:
Basic FrameSaver NP 110
a. The UNIT POWER LED will light immediately and stay on.
b. The UNIT READY LED will flash while the unit performs its self-
test (test duration - approximately 60 seconds).
c. The UNIT READY LED will be ON steady after successful comple-
tion of the self-test.
d. The NETW ALARM and UNIT FRM MGMT LEDs should not be
flashing together.
e. All other LED indications should be ignored at this time.
USER PORT
FUSE
5A/250V
SLOW BLOW
5x20mm
100-240 VAC
5A
50-60 Hz
O
N
12
FOR CONTINUED
PROTECTION
AGAINST RISK OF
FIRE, REPLACE ONLY
WITH SAME TYPE
AND RATING
OF FUSE.
"CAUTION"
SWITCHED
AC OUT
250VAC
4.5A MAX
1 2
(IEC 320, female)
AC Power Input
(IEC 320, male)
Switched AC Output
Frame Ground
Screw
35


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Paradyne FrameSaver NP 110 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Paradyne FrameSaver NP 110 in the language / languages: English as an attachment in your email.

The manual is 1,17 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info