For connexions 01, 02 and 08, it is recommended the use 35mm
2
cross-section cables, if
the length of the connexion is less than or equal to 1 meter. If the length of the connexion
exceeds 1 meter, it is recommended the use of cables with a cross-section of 50mm
2
. It is
also advisable to install a 200A fuse on cables 01 and 08.
Tighten the terminals firmly to screws 1, 2, and 3 of the 3Link , with the supplied nuts
and washers.
Connections 03, 04, 05 and 06 are usually already present within the vehicle. If not present,
it is recommended to use cables with a section greater than or equal to 10mm
2
.
Connection 07 can be done with cable the cross-section of which is between 1mm
2
and
2.5mm
2
.
As soon as the ground cable is connected to the 3Link, the system becomes operational.
Charge completely just after installing the system or after doing any maintenance on
it. When it is fully charged, the display will show 100% on the battery state of
charge (SOC) display.
Close the 3Link cover by threading the two tabs on the back into the appropriate base
seats; tighten the 2 screws supplied into the holes at the front corners of the cover.
4.3 DISPLAY INSTALLATION
Front View: Rear view:
1
2
3
4