726075
51
Zoom out
Zoom in
Previous page
1/236
Next page


Fig.1-4
Fig.1-6
1.2 Install the main body
Cut
a quadrangula
r
hol
e of 880x880mm in the ceiling
according to the shape of the installation paper board.
(Refer to Fig.1-2)
The center of the hole should be at the same position of
that of the air conditioner body.
Determine the lengths and outlets of the connecting pipe,
drainpipe and cables.
To balance the ceiling and to avoid vibration, please
enforce the ceiling when necessary.
Adjust the hexangular nuts on the four installation hooks
evenly, to ensure the balance of the body.
If the drainpipe is awry, leakage will be caused by the
malfunction of the water-level switch.
Adjust the position to ensure the gaps between the body
and the four sides of ceiling are even. The body's lower
part should sink into the ceiling for 10~12 mm (Refer to
Fig.1-4) .
In general, L is half of the screw length of the installation
hook. (Refer to Fig.1-4)
Locate the air conditioner firmly by wrenching the nuts
after having adjusted the body's position well. (Refer to
Fig.1-5)
Select the position of installation hooks according to the
hook holes on the installation board.
Drill four holes of
Ø 12mm, 45~50mm deep
at the selected
positions on the ceiling. Then embed the expansible
hooks (fittings).
Face the concave side of the installation hooks toward the
expansible hooks. Determine the length of the installation
hooks from the height of ceiling, then cut off the
unnecessary part.
If the ceiling is extremely high, please determine the
length of the installation hook according to facts.
1
2
3
1
2
3
4
New built houses and ceilings
In the case of new built house, the hook can be embedded
in advance (refer to 2 mentioned above). But it should be
strong enough to bear the indoor unit and will not become
loose because of concrete shrinking.
After installing the body, please fasten the installation paper
board onto the air conditioner with bolts(M6X12) to
determine in advance the sizes and positions of the hole
opening on ceiling. (Refer to Fig.1-6)
Refer to 3 above for installation.
Remove the installation paper board.
Please first guarantee the flatness and horizontal of
ceiling when installing it.
Refer to 1 mentioned above for others.
After installing the body, the four bolts(M6x12)must be
fastened to the air conditioner onto ensure the body is
grounded well.
CAUTION
The existing ceiling (to be horizontal)
Do not install the unit in an area where flammable materials
are present due to risk of explosion resulting in serious
injury or death.
DANGER
If the basis underneath the unit is not strong enough to
support the weight of the unit, the unit could be fall out of
place and cause serious injury.
WARNING
Unit: mm
>1000mm
>1000mm
>1000mm
>1000mm
Fig.1-5
51
51


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for MundoClima MUCSR-H9 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of MundoClima MUCSR-H9 in the language / languages: English, German, French, Portuguese, Spanish as an attachment in your email.

The manual is 15,36 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info