776296
38
Zoom out
Zoom in
Previous page
1/123
Next page
MI 3108 EurotestPV Measurements a.c. LV installations
38
5 Measurements a.c. LV installations
5.1 Voltage, frequency and phase sequence
Voltage and frequency measurement is always active in the terminal voltage monitor. In
the special VOLTAGE TRMS menu the measured voltage, frequency and information
about detected three-phase connection can be stored. Measurements are based on the
EN 61557-7 standard.
See chapter 4.2 Function selection for instructions on
key functionality.
Figure 5.1: Voltage in single
phase system
Test parameters for voltage measurement
There are no parameters to be set.
Connections for voltage measurement
Figure 5.2: Connection of 3-wire test lead and optional adapter in three-phase system
38


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Metrel MI 3108 - Eurotest PV at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Metrel MI 3108 - Eurotest PV in the language / languages: English as an attachment in your email.

The manual is 3.81 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Metrel MI 3108 - Eurotest PV

Metrel MI 3108 - Eurotest PV User Manual - German - 136 pages

Metrel MI 3108 - Eurotest PV User Manual - Dutch - 62 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info