776296
37
Zoom out
Zoom in
Previous page
1/123
Next page
MI 3108 EurotestPV Instrument operation
37
Keys:
TEST
Confirms clearing. In Delete all option YES must be
selected.
ESC / Function selector
Exits back to main function menu without changes.
PV measurements settings
Parameters for PV measurements can be
set in this menu.
Figure 4.24: Selection of PV
measurement settings
Parameters for PV measurements:
Test std
Testing standard [IEC 60891, CEI 82-25]
Irr. Sens.
Type of irradiance measuring sensor [PV cell, Pyran.]
Irr. min.
Minimal valid solar irradiance for calculation [500 1000 W/m2]
T. sensor
Temperature for calculation [Tamb, Tcell]
Mod.Ser.
Number of modules in serial [1 30]
Mod.Par.
Number of modules in parallel [1 10]
Correct. T
Correction of measured cell temperature to compensate for the
difference between the actual cell and temperature and the measured
temperature. [0 5 °C]. According to the EN 61829 standard the
difference is typically 2 °C. [Off, 1 °C – 5 °C]
Warn. Irr
Limit for the unstable irradiance warning [Off, 1 % 20 %]
Warn. Uoc
Limit for the improper Uoc warning [Off, 5 % 50 %]
Selection of PV test parameters
Keys:
UP / DOWN
Selects appropriate option.
TEST
Enables changing data of selected parameter.
MEM
Saves settings.
ESC / Function selector
Exits back.
Changing data of selected parameter
Keys:
UP / DOWN
Sets parameter.
TEST
Confirms set data.
ESC / Function selector
Exits back.
37


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Metrel MI 3108 - Eurotest PV at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Metrel MI 3108 - Eurotest PV in the language / languages: English as an attachment in your email.

The manual is 3.81 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Metrel MI 3108 - Eurotest PV

Metrel MI 3108 - Eurotest PV User Manual - German - 136 pages

Metrel MI 3108 - Eurotest PV User Manual - Dutch - 62 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info