694278
18
Zoom out
Zoom in
Previous page
1/50
Next page
PELLET STOVES Chapter 3
INSTALLATION AND USE MANUAL
page 18
Installation and fitting Technical service - Rights reserved MCZ S.p.A. - Reproduction prohibited
3.2. PREPARATION AND UNPACK ING
SOLAR and GEA stoves are delivered in two packages:
9 The first contains the stove (Fig. 1)
9 The second contains the ceramic cladding. (Fig. 2)
Open the packaging, take off the bands, remove the stove unit from
the pallet and position it in the chosen location, taking care that its
position complies with the above instructions.
The stove body or unit must always be kept in a vertical position when
moved, and moved only using carts. Special care must be used to
protect the door and the glass from impacts that would damage them.
Moving the product must always be done with care. If possible, unpack
the stove in the area where it is going to be installed.
The materials which make up the packaging are not toxic or harmful,
so no special procedures for disposal by required.
Their storage, disposal or possible recycling are therefore the responsibility
of the final user, in compliance with current legislation on the subject.
Do not store the stove unit or its cladding without their packaging.
If the stove needs to be connected to a discharge pipe which goes
through the rear wall (to connect up with the flue), take the greatest
care to make sure that the joint is not stressed.
Use the four adjustable feet (J) to get the stove correctly levelled so
that the smoke outlet (S) is lined up with the connecting pipe (H) .
If the smoke outlet of the stove is forced or used
improperly to lift it or position it, the operation of the
stove can be damaged irreparably (fig. 4).
S
H
Figure 1 – Example of stove packaging
Figure 2 - Example of packing for
ceramics
1. Turn the feet clockwise to
lower the stove
2. Turn the feet counter-
clockwise to lower the
stove
J
J
Downloaded from www.Manualslib.com manuals search engine
18


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for MCZ SOLAR at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of MCZ SOLAR in the language / languages: English as an attachment in your email.

The manual is 3,5 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of MCZ SOLAR

MCZ SOLAR Usermanual and installation guide - Dutch - 60 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info