694358
27
Zoom out
Zoom in
Previous page
1/65
Next page
PELLET STOVES Chapter 3
INSTALLATION AND USE MANUAL
page 27
Installation and assembly Technical service - Rights reserved MCZ Group S.p.A. - Reproduction prohibited
B
C
C
With the screw D close the sheet metal E that keeps profile A
locked
Before refitting the grill B with the two screws C, also insert
the side tiles (See par.3.4.2)
A
B
C
C
D
E
A
F
3.4.2. Installation of side tiles
Remove the micro-perforated grill B and insert the three side tiles,
making them slide from the top towards the bottom on the runners of
the profiles A. On the upper and lower part of the tile it is advisable to
place small felt pads. Level the bubbles of the tiles. At this point it is
possible the retighten the micro-perforated grill B to the structure and
position the ceramic top. (fig.9)
3.4.3. Installation of ceramic top
Install the top by setting it on the four upper protuberances of the
stove. The part underneath is provided with four small cavities at the
rubber supports indicated in the figure 10
.
Figura 10 - Supports for installation of ceramic top
Figure 8 – Installation of lower front panel
Fi
g
ura 9
Installation of side tiles
Downloaded from www.Manualslib.com manuals search engine
27


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for MCZ Musa Air 2011 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of MCZ Musa Air 2011 in the language / languages: English as an attachment in your email.

The manual is 4,32 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info