638358
7
Zoom out
Zoom in
Previous page
1/12
Next page
6
ASSEMBLY STEPS
J
H
26
Overhead obstructions within the “use”
zone shall not be within 84" (2.15 m) of
the highest platform (platform #4). All
overhead utility line clearances shall
comply with all local, state and national
codes such as the National Electric
Safety Code.
1
6' (2 m)
minimum
6' (2 m)
minimum
6' (2 m)
minimum
6' (2 m)
minimum
WARNING:
Observing the following statements and
warnings reduces the likelihood of
serious or fatal injury.
Unit must be properly anchored prior to use.
Inspect product at regular intervals for
wear or loose hardware. Remove from
service if any abnormal conditions such as
cracks or breaks exist. Failure to perform
periodic checks could cause the anchored
product to overturn or cause a fall.
Anchors must be used on level ground.
Anchors must be installed entirely below
ground level to prevent children from
tripping.
SAFETY
CLEARANCE
ZONES
Orient the unit in the area intended for the installation.
CAUTION: Ensure that at least 6' (2 m) of clear,
unobstructed space surrounds the unit in every
direction. The safety
“use” zone must be free of all
obstacles such as: trees, posts, fences, buildings,
curbs, structures, etc.
TOTAL minimum space required 18' (5.5 m) x 24'
(7.3 m).
Once the 6' (2 m) safety “use” zone and
84" (2.15 m) overhead zone have been
established, mark the anchor areas as
shown above. Mark holes as close to the
unit as possible near the anchor cabling
holes in the climber. Carefully move the unit
away from the marked holes and proceed
to “Anchoring the Unit” section.
MARKING
ANCHOR
HOLES
18' (5.5 m)
minimum
24' (7.3 m)
minimum
7


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Little tikes 401A CLIMBING TOWERS PLAYGROUND at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Little tikes 401A CLIMBING TOWERS PLAYGROUND in the language / languages: English, French, Spanish as an attachment in your email.

The manual is 2,17 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info