686408
11
Zoom out
Zoom in
Previous page
1/48
Next page
11
A7 TIG Orbital System 150© Kemppi Oy 2016 1615
OPERATING MANUAL
2.3 Suitable collets to the collet frame
The collets are designed to clamp rmly on the outside
diameter (OD) of the tube or ttings to be welded. The
interior diameter (ID) of standard collets is oversize relative
to the tube to be welded by .075 mm to allow for standard
dimensional tolerances. The collet halves that make a pair
are identical. They are engraved to show the tube OD or
tube tting OD and type.
1. Install the two (2) pairs of appropriate collets on
either side of the weld head collet frame using
button head screws. The collet inserts are not
threaded to eliminate stripped threads in the collet
frame, which is more expensive to repair or replace.
2. Accomplish rm clamping by slight over-closure
of the collet frame. Compliance and preload are
provided by the collet frame adjustable latch
mechanism.
The latch lever provides very high clamping loads
with minimal eort. After adjusting the thumbscrew on
the latch mechanism, the toggle action of the lever should
require no more than light pressure of one nger to close.
Over-tightening can result in damage to the collet frame or
tubing.
2.4 Mounting the weld head
Do the following:
1. Install suitable collets on the weld head.
2. Install suitable electrode in the holder.
3. Mount the weld head on the tube and align the
tungsten electrode with the welding joint.
4. Close one side of the weld head and lock it
against the tube with the latch.
5. Place the other tube very tightly against the rst
tube already clamped.
6. Close the other side of the weld head and lock
with the latch.
7. Look through the hole on top of the weld head to
ensure that the alignment is right.
8. Close the hole cover.
11


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Kemppi A7 TIG Orbital System 150 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Kemppi A7 TIG Orbital System 150 in the language / languages: English as an attachment in your email.

The manual is 3,16 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info