771570
20
Zoom out
Zoom in
Previous page
1/48
Next page
7 - INSTALLATION AND START UP
7.8 DX COIL SECTION (FIG. 8)
The unit is supplied with plugged direct expansion coil by SAE/FLARS connections: to ensure its tightness during
storage and transport, inside it is loaded nitrogen gas at a higher pressure than atmospheric.
CAUTION: Nitrogen is sealed inside the main unit perform the following airtightness check, verify that a “pffft”
sound occurs, when the nut is unscrewed.
Preparation of pipes:
Cut the copper tube to the required length with a tube cutter. It is recommended to cut approx. 30 – 50 cm longer than
the tubing length you estimate.
Remove burrs at each end of the copper tubing with a tube reamer
m
r file (A fig. 8).
This process is important and should be done carefully to make a good flare. Be sure to keep any contaminants
(moisture, dirt, metal filings, etc.) from entering the tubing.
Apply a sealing cap or water-proof tape to prevent dust or water from entering the tubes before they are used.
Adjust the shape of the liquid tube using a tube bender at the installation site and connect it to the liquid tubing side
valve.
Remove the flare nut from the unit and be sure to mount it on the copper tube.
Make a flare at the end of the copper tube with a flare tool (B fig.8).
A good flare should have the following characteristics: inside surface is glossy and smooth, edge is smooth, tapered
sides are of uniform length.
Apply a sealing cap or water-proof tape to prevent dust or water from entering the tubes before they are used.
Be sure to apply refrigerant lubricant (ether oil) to the inside of the flare nut before making piping connections (C fig.
8). This is effective for reducing gas leaks.
For proper connection, align the union tube and flare tube straight with each other, then screw on the flare nut
lightly at first to obtain a smooth match.
Adjust the shape of the liquid tube using a tube bender at the installation site and connect it to the liquid tubing side
valve using a flare (D fig. 8).
Repeat operations for the second connecting pipeline.
pag. 20
20


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Kaysun KRE-2300DX1 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Kaysun KRE-2300DX1 in the language / languages: English as an attachment in your email.

The manual is 3.62 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info