- 30 -
ENGLISH
HOT-AIR DUCTWORK
KIT 12 (code 778150) (optional)
TO CHANNEL HOT AIR INTO AN ADJACENT ROOM
IN ADDITION TO THAT OF INSTALLATION
Includes:
a Box n° 1
b Ø 8 pipe n° 1
c Smoke outlet end-piece n° 1
g Pipe blocking clamp n° 2
NOTE:
THE FIRST PART OF THE FLEXIBLE PIPE MUST BE
COMPLETELY “RELAXED” IN SUCH AWAY TO ELI-
MINATE CORRUGATION. IN THIS WAY, THE INTER-
NAL DIAMETER WILL BE SLIGHTLY ENLARGED TO
FAVOUR ENTRANCE.
Procedure:
- De• ne the position of the stove with respect to the walling
(• g. a).
- Place the stove in its de• nite position.
- Extend the aluminium pipe (b) for hot air channelling, wi-
thout connecting the stove outlet.
- Fit the alluminium pipe to the hot air oulet on the back of the
stove (• g.C) and fasten it by its blocking clamp (g)
- Install the terminal outlet (c) to the end of the alluminum pipe
by its blocking clamp (g) (• g. c) in the room to heat