568872
9
Zoom out
Zoom in
Previous page
1/50
Next page
8
English
(2) It is recommended using the recommended oil (SHELL
TONNA). Other applicable oils are listed. Never mix
two or more types of different oils.
3. Load nails
CAUTIONS
When loading nails into Nailer,
(1) do not depress trigger;
(2) do not depress push lever; and
(3) keep your face, hands feet and other body parts,
as well as those of other persons away from the
nose muzzle to avoid possible injury during usage
and carrying.
Do not insert different length sized nail strips at same
time. If do so, it could result in damaging nail strips
and jamming.
Always point first nail protruded from the nose away
yourself and others.
Keep your face, hands, feet, other body parts as well
as those of other person away from the nose muzzle
to avoid possible injury during usage and carrying.
(1) Align the nail head with nail length indicated on load
slot of the magazine cover, and then load the nails
(See Fig. 2).
(2) Slide the nail strip forward in the magazine.
The nail strip should pass over the nail stopper, which
means it is in proper position (See Fig. 3).
(3) Pull the nail feeder back with depressing the feeder
plate knob to push the nail strip.
NOTE
Use nail strip of more than 5 nails.
The Nailer is now ready to operate.
Removing the nails:
1 Depress the feeder plate knob slightly and slowly
slide the nail feeder forward.
2 Remove the nails from the Nailer.
CAUTION
To prevent unintentional operation, never touch the
trigger or place the top end of the push lever on a
work bench on floor. Also, never face the nail outlet
toward any part of a person.
STANDARD ACCESSORIES
(1) Hexagon bar wrench for M6 screw ...........................1
(2) Hexagon bar wrench for M5 screw ........................... 1
(3) Hexagon bar wrench for M4 screw ........................... 1
(4) Eye protector .............................................................. 1
(5) Oiler ............................................................................. 1
APPLICATIONS
CAUTIONS
Pre-punched holed metal connector to wood stud
installation only.
Never drive nails into metal or concrete.
Metal hardware with pre-punched holes to wood
stud installation only.
Straps, Joist hangers, framing anchors
PREPARATION PRIOR TO OPERATION
1. Prepare the hose
Be sure to use the hose provided with minimum
8 mm (5/16”) inside diameter.
NOTE
The air supply hoses must have a minimum working
pressure rating of 12.8 bar (180 psi.) or 150 percent of
the maximum pressure produced in the air supply
system, whichever is higher.
2. Check on safety
CAUTIONS
Unauthorized persons (including children) must be
kept away from the equipment.
Wear eye protector.
Check the retaining screws which fix the exhaust
cover, etc. for tightness.
Check the nailer for air leaks and defective or rusty
parts.
Check whether or not the push lever works correctly.
Also check whether or not any dirt has adhered to the
moving parts of the push lever.
Recheck on operational safety.
BEFORE USE
1. Check the air pressure
CAUTION
The air pressure must be constantly maintained at
4.9 – 8.3 bar (70 – 120 psi.).
Adjust the air pressure between 4.9 to 8.3 bar (70 –
120 psi.) according to the diameters and length of
nails and hardness of the wood being nailed. Pay
special attention to the output pressure, capacity,
and piping on the air compressor, so that air pressure
does not exceed the specified limit. Note that
excessive pressure may affect overall performance,
service life, and safety.
2. Lubrication
(1) Prior to operating this nailer, be sure to provide an air
set between the air compressor and this device.
Lubrication through the air set offers smooth
operation, extended service life, and anticorrosion.
Adjust the oiler so that a single drop of oil is supplied
at intervals of 5 to 10 nailing cycles.
Nail point
9


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Hitachi NR50AK at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Hitachi NR50AK in the language / languages: English, German, Dutch, French, Italian, Spanish as an attachment in your email.

The manual is 5,13 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info