386508
28
Zoom out
Zoom in
Previous page
1/34
Next page
26
English
2. Battery installation
Insert the battery while observing its polarities (see
Fig. 2).
CHARGING
Before using the driver drill, charge the battery as
follows.
1. Insert the battery in the charger.
Position the battery so that the nameplate faces
toward the nameplate of the charger and press in
the battery until it comes into contact with the
bottom plate. (See Figs. 1 and 3)
2. Connect the charger power cord to the AC outlet.
Connecting the power cord will turn on t he charger
(the pilot lamp lights up).
CAUTION
If the pilot lamp does not light up pull out the
power cord from the AC outlet and check the
battery mounting condition.
About 1 hour is required to fully charge the battery
at a temperature of about 20°C. The pilot lamp goes
off to indicate that the battery is fully charged.
CAUTION
If the battery is heated due to direct sunlight,
etc., just after operation, the charger pilot lamp
may not light. At that time cool the battery first,
then start charging.
3. Disconnect the charger power cord from the AC
outlet.
4. Hold the charger firmly and pull out the battery.
PRIOR TO OPERATION
1. Setting up and checking the work environment
Check if the work environment is suitable by follow-
ing the precautions.
HOW TO USE
CAUTION:
Before installing batteries, make sure that the
reversing switch is in neutral position. (See Fig. 4.)
1. Confirm the cap position (see Fig. 5)
The tightening power of this unit can be adjusted
according to the cap position, at which the cap is
set.
(1) For using the unit as a screw driver, set the cap
white line to one of the numerals 1 to 5 on
the outer frame.
(2) For use as a drill, set the white line at the drill mark
(see Fig. 5).
CAUTION
Set the cap white line at one of either the numerals
or drill marks.
2. Tlightening power adjustment
(1) Tightening power
Tightening power should correspond in its intensity
to the screw diameter. When too strong power is
used, the screw head may be broken or be injured.
Be sure to adjust the cap position according to the
screw diameter.
2. Plus driver bit
Bit No. Screw size
No. 2 3-5 mm
OPTIONAL ACCESSORIES (sold separately)
1. Battery (FEB7)
3. Minus driver bit
a Screw size
0.8 mm 4 mm
5. Drill bit for steel
Diameter, 2 mm, 5 mm, 6 mm.
6. Drill bit for wood
Diameter, 10 mm, 13 mm.
Optional accessories are subject to change without notice.
APPLICATIONS
Driving and removing of machine screws, wood
screws, tapping screws, etc.
Drilling of various metals.
Drilling of various woods.
BATTERY REMOVAL/INSTALLATION
1. Battery removal
Hold the handle tightly and push the battery latch
to remove the battery (see Figs. 1 and 2).
CAUTION
Never short-circuit the battery.
4. Hexagon socket (for nuts and bolts)
Socket No. Screw size
74 mm
85 mm
Socket No.
28


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Hitachi fds 10 dv at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Hitachi fds 10 dv in the language / languages: English, Danish, Swedish, Norwegian, Finnish as an attachment in your email.

The manual is 0,46 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Hitachi fds 10 dv

Hitachi fds 10 dv User Manual - English, German, Dutch, French, Italian, Portuguese, Spanish - 38 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info