590654
5
Zoom out
Zoom in
Previous page
1/14
Next page
GMC-I Messtechnik GmbH 5
2 Applications
The METRISO PRIME insulation tester complies with regulation
IEC 61557/EN 61557/VDE 0413 “Measuring and Monitoring Equipment
for the Testing of Electrical Safety in Systems with Nominal Voltages of up
to AC 1000 V and DC 1500 V” Part 2, insulation resistance testers.
It is suited for the measurement of insulation resistance for devices and
systems in a voltage-free condition with nominal voltages of up to 1000 V.
It is also suited for the measurement of insulation resistance of up to 1 T
with open-circuit voltages of up to 5000 V.
Additionally, the tester is equipped with a 2000 V measuring range for
direct and alternating voltages. This is especially advantageous for the
testing of DUTs for the absence of voltage, and for the discharging of
capacitive DUTs.
3 Initial Start-Up
For initial start-up of the METRISO PRIME with crank generator or of the
METRISO PRIME with accessory crank generator module see Chapter 8
and Chapter 3.4. For initial start-up of the METRISO PRIME with battery
operation mode see Chapter 3.1 to Chapter 3.4.
3.1 Battery Installation
Attention!
!
Before opening the battery compartment (green side panel) be
absolutely certain that the function selector switch is set to the
“V” position, and that the range selector switch is set to the “OFF/
V” position, and that the device is completely disconnected from
all external power circuits.
Ð Unscrew and remove the battery compartment.
Ð Remove the battery clip.
Ð Pull the battery holder out of the battery compartment.
Ð Insert 6 commercially available 1.5 V type IEC R20 or IEC LR20 bat-
teries or storage batteries (single cell) into the battery holder with cor-
rect poling as indicated by the symbols.
Ð Push the battery holder back into the battery compartment.
Ð Push the battery clip back over the contacts making certain that cor-
rect poling is assured.
Ð Return the battery compartment to the housing in the correct direc-
tion (labeling must be legible) and fasten with screws.
3.2 Testing the Batteries
After the batteries have been installed, or if the indicator LED fails to
light up during insulation resistance measurement, the batteries should be
tested. For battery testing the range selector switch must briefly be set to
the position. Deflection of the needle gauge within the scale for the
battery test indicates the condition of the batteries or storage batteries at
an average load of 1000 V test voltage. The position of the function selec-
tor switch need not be taken into consideration. The left end of the scale
represents minimum required supply voltage, and the right end represents
maximum available supply voltage.
Note
If the needle only moves into the minimal supply voltage range,
several measurements can still be performed for test voltages of
less than 1000 V, because the battery test is conducted with the
same load as is used for a test voltage of 1000 V.
3.3 Switching the Tester On and Off
As long as the function selector switch is set to , and the range selector
switch is not in the OFF/V position, the tester remains activated. For pur-
poses of transport and maintenance we recommend that the function
selector switch be set to the V position, and the range selector switch to
the OFF/V position, in order to prevent unintentional activation of the tes-
ter.
Note
Be certain that the grip on the function selector switch points
exactly to “V” or “. No intermediate selector switch positions
have been defined, and inaccurate switch positioning leads to
meaningless measurement results. This is especially important
during discharging of capacitive devices under test, because volt-
ages are not displayed in intermediate selector switch positions.
5


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Gossen Metrawatt METRISO PRIME at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Gossen Metrawatt METRISO PRIME in the language / languages: English as an attachment in your email.

The manual is 0,31 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Gossen Metrawatt METRISO PRIME

Gossen Metrawatt METRISO PRIME User Manual - German - 14 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info