813416
18
Zoom out
Zoom in
Previous page
1/36
Next page
18
Installation Instructions
4.5 Ensure the 2-piece front panels are engaged against the
centre support tags on the burner and are pushed together
in the middle, see Diagram 14.
14
Front and Lower Side Panels
4.6 Slide the 2 side panels up to the rear panel,
see Diagram 15.
15
Side Panels
NOTE: THE HORIZONTAL CHAMFERS MUST ALIGN ON
THE REAR AND SIDE PIECES.
Black Glass
NOTE: ALL REAR PANELS ARE ONE PIECE.
HOLD THE REAR PANEL UNTIL ALL THE OTHER
PANELS ARE IN PLACE AS THEY CAN FALL FORWARD.
4.7 Place the lower side and front panels in position so the
chamfers meet at the front edge of the burner.
4.8 Ensure the 2-piece front panels are engaged against the
centre support tags on the burner and are pushed together
in the middle, see Diagram 16.
16
Front and Lower Side Panels
4.9 Fit and centralise the rear panel, see Diagram 17.
17
Rear Panel
4.10 Slide the 2 side panels up to the rear panel,
see Diagram 18.
18
Side Panels
5. Arrangement of the fuel bed
Advice on handling and disposal of
fire ceramics
The fuel effect of the log version of this appliance
is made from Refractory Ceramic Fibre (RCF),
a material which is commonly used for this
application.
Protective clothing is not required when handling
these articles, but we recommend you follow
normal hygiene rules of not smoking, eating or
drinking in the work area and always wash your
hands before eating or drinking.
To ensure that the release of RCF bres are kept
to a minimum, during installation and servicing a
HEPA ltered vacuum is recommended to remove
any dust accumulated in and around the appliance
before and after working on it. When servicing the
appliance it is recommended that the replaced
items are not broken up, but are sealed within
heavy duty polythene bags and labelled as RCF
waste.
RCF waste is classed as stable, non-reactive
hazardous waste and may be disposed of at a
licensed landll site.
Excessive exposure to these materials may cause
temporary irritation to eyes, skin and respiratory
tract; wash hands thoroughly after handling the
material.
18


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Gazco Vision Large MK2 Series Balanced Flue Instructions at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Gazco Vision Large MK2 Series Balanced Flue Instructions in the language / languages: English as an attachment in your email.

The manual is 4.65 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info