813415
23
Zoom out
Zoom in
Previous page
1/36
Next page
23
Commissioning
1. Commissioning
1.1 Check the flame picture, log/pebble layout.
1.2 Check the gas pressure.
1.3 Close all door and windows in the room.
1.4 Ignite the Studio and operate on maximum for 5 minutes.
1.5 Position a lighted smoke match just inside the draught
diverter opening and check all smoke is drawn in along the
opening.
If there is any doubt:
1.6 Run the appliance for a further 10 minutes and repeat the
test, see Diagram 1.
1
1.7 Complete the Commissioning Checklist at the front of this
manual covering:
— Flue checks
— Gas checks
— Log/fuel effect layout - flame picture
For working pressure test, use the access panel at the gas
connection ensuring the burner is in position. Refer to
Replacement Parts, Section 18.
1.8 Upon completion of the commissioning and testing of the
installation and correct operation of the appliance, the
installer must instruct the user how to operate the appliance.
1.9 Guide the user through the User Instructions paying
particular attention to:
a) Regular servicing (Section 12 of the User Instructions).
b) Ventilation (Section 13 of the User Instructions) - point out
the ventilation positions where applicable.
c) Hot surfaces (Section 15 of the User Instructions).
d) How the appliance works with the touch pad control
(Section 5 of the User Instructions).
e) How the appliance works with the remote control handset
and the modes of operation (Section 2 of the User
Instructions).
f) How to change settings in the auto mode and program
modes of operation.
g) What to do if the appliance fails to operate (Section 16 of
the User Instructions).
If there are any extractor fans in the room or adjacent
rooms, the test must be repeated with the fans running on
maximum.
IF SPILLAGE PERSISTS, DISCONNECT THE APPLIANCE
ANDSEEKEXPERTADVICE.
For future reference, record the installation details on the
Commissioning Sheet on page 3.
2. Pairing the appliance
To access the control panel in order to pair the
appliance it will be necessary to remove the Main
Control Assembly, see Servicing Section 4.
If there is no communication between the remote control
and the appliance after replacing the control box or the
handset, it will be necessary to pair the two together.
Before starting the pairing process ensure the handset
is programmed to Channel 'C' see Section 3.
2.2 Ensure batteries are fitted and working in the handset.
2.3 Check all leads and cables are connected correctly.
2.4 Ensure the handset is unlocked. To unlock the handset
select Unlock followed by OK - the symbol will change to
( ).
2.5 Press the ON/OFF button () on the handset and keep it
depressed until the screen changes to the configuration
menu. This may take up to 30 seconds and the screen may
go blank before changing to the configuration screen.
2.6 When the configuration menu screen appears change the
Pairing option to ON using the Change button.
2.7 Within 20 seconds press the yellow button on the control
unit repeatedly until a single beep is heard confirming the
pairing operation has been successful, see Diagram 1. This
may be easier using a pencil, ball point pen or similar.
Remote Handset
Pairing Button
1
23


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Gazco Riva Vision Large MK1 Series Conventional Flue at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Gazco Riva Vision Large MK1 Series Conventional Flue in the language / languages: English as an attachment in your email.

The manual is 3.57 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info