813418
28
Zoom out
Zoom in
Previous page
1/36
Next page
28
10
AR2148
6.4 Replace in reverse order.
Note: THE HORIZONTAL CHAMFERS MUST ALIGN ON
THE REAR AND SIDE PIECES.
7. MAIN BURNER
7.1 To replace the main burner:
Remove the stone chippings from the burner (optional).
Remove the black enamelled panels, see Section 5.
Remove the burner securing screw from the left side of
the burner, Diagram 11.
11
AR1867
7.2 Slide the burner fully to the left and lift the right side clear
of the pilot, Diagram 12.
12
AR1868
7.3 Slide the burner to the right and out of its location
Refit in reverse order
When refilling the stone chippings, fill to the level of the rim
of the burner tray and flatten level.
Ensure no stone chippings fall into the pilot area.
8. MAIN CONTROL ASSEMBLY
DISCONNECT THE BATTERIES PRIOR TO REMOVAL OF
THE ASSEMBLY. SEE SECTION 4 USERS INSTRUCTIONS.
8.1 To access the main control assembly, first remove:
The decorative frame.
The window frame.
The enamelled panels.
The main burner.
8.2 To remove the access panel undo the two screws, Diagram
13.
Note the orientation of the access panel with the
return edges facing forward
13
AR1869
8.3 Isolate the gas supply at the isolation device and disconnect
the gas inlet, Diagram 14.
14
AR1888
8.4 Remove the six screws securing the control assembly,
Diagram 15.
SERVICING INSTRUCTIONS
REPLACING PARTS
28


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Gazco RIVA VISION LARGE 8000 series Balanced Flue at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Gazco RIVA VISION LARGE 8000 series Balanced Flue in the language / languages: English as an attachment in your email.

The manual is 1.05 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info