689492
48
Zoom out
Zoom in
Previous page
1/75
Next page
4-16
5. Connect the XH connector assembly (supplied) between J501 (13P) on the
RGB BUFF Board and J108 (13P) on the SPU Board.
6. Bind XH connector with coach clip (supplied).
7. Connect a monitor cable (D-SUB15P connector cable, local supply) between
the RGB BUFF Board and the external CRT.
Figure 4-19 Connection of external monitor to RGB BUFF board
8. Close the rear cover.
4.6 Performance Monitor PM-30
The PM installation kit provides power switching for the Performance Monitor
PM-30 and mainly consists of the PM-INT circuit board. Install the kit as follows:
Table 4-6 Contents of PM installation kit OP03-154 (Code no. 000-849-083)
Name Type Qty Code No.
PM-INT Board
(PM INTERFACE Board)
03P9225 1 008-487-620
Connector Assy. VH3P-L300-AA 2 000-141-014
Spacer SQ-10 3 000-801-678
XH Connector Assy. 03-1974 (3-3P) 1 008-490-850
Panhead Screw M3x8 C2700W 3 000-881-404
1. Unfasten eight screws to remove the cover.
2. Remove the top cover.
3. Attach three spacers to the bottom of the GYRO PROCESSOR Board
(64P1106A). Fasten the PM-INT Board (03P9225) to the spacers with panhead
screws (supplied).
4. Solder the VH connector assy. (supplied) to the power line (100/220 VAC) and
connect the line to J402 on the PM-INT Board.
48


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Furuno FR1525 MARK-3 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Furuno FR1525 MARK-3 in the language / languages: English as an attachment in your email.

The manual is 2,2 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Furuno FR1525 MARK-3

Furuno FR1525 MARK-3 User Manual - English - 125 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info