616299
15
Zoom out
Zoom in
Previous page
1/89
Next page
1-7
1.2.2 Mounting the processor unit
1. Drill four holes of 12 mm in diameter in the mounting location.
2. Unfasten 15 binding screws (M4) to remove the processor unit cover.
WARNING
Binding Screw
M4X8, 15 pcs.
Figure 1-5 Processor unit
3. Fasten the processor unit to the mounting location with four each of M10 bolts, nuts and
washers, using the pipe box spanner (supplied). See the figure on the next page for location
of fixing holes.
How to access the rear-left fixing hole
The rear-left fixing hole is hidden under the PTU board cover. To access it do the following:
a) Loosen five M3X8 screws at the top of the PTU board cover and two M4X8 screws at the
front of the cover.
b) Grasp the knob on the cover and slide the cover toward the front of the unit to release it.
How to access the front-right fixing hole
The front-right fixing hole is hidden beneath the RGB Board. To access it do the following:
a) Unfasten the M4X8 pan-head screw from the RGB board mounting plate.
b) Unfasten two pan-head screws (M3X10) fixing the M-card cover.
4. After mounting the unit, fasten the PTU board cover and RGB board mounting plate, and
then close the processor unit.
15


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Furuno FR-2125-B at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Furuno FR-2125-B in the language / languages: English as an attachment in your email.

The manual is 4,38 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info