724590
26
Zoom out
Zoom in
Previous page
1/40
Next page
24
Digital Inverter Generator with Pure Sine Wave
AFTER SALES SUPPORT
e-mail: info.aldi@positecgroup.com 1300 889 028
MODEL: №. XG-KF2000 • 03/2020 • 700069 (toll free)
AFTER SALES SUPPORT
(toll free)
e-mail: info.aldi@positecgroup.com1300 889 028
Digital Inverter Generator with Pure Sine Wave
MODEL: №. XG-KF2000 • 03/2020 • 700069
red load status indicator (5) LED will illuminate. The generator will continue to
supply 240Va.c output for a very short time, but if the load is not reduced, the
240V supply will be automatically shut down. To reduce load rstly you can
stop using one appliance and turn it o , see if that recties the problem. If not
refer to page 15 on loading’s and how they work. If this does NOT solve your
problem, or you do not reduce load fast enough, the output of the generator
will be automatically shut down, and the petrol motor will continue to run.
You will now need to reset the overload condition by shutting down the petrol
motor (Fig P), and thus restart the engine after the load being applied to the
generator has been reduced. Refer to the Overload procedure for re-starting
and re-setting the engine. Always connect the largest appliance you want to
run rst allowing it time to draw current to start . After 20-30 seconds connect
the second appliance.
Normal procedure for Stopping the Engine
(Full shut down and Store)
1. Turn “OFF” the 240Va.c Outlet Power On/O switch (1) by pushing the
switch to the right hand side to the "O" position. (Fig R).
2. Remove any appliances connected to either of the 2 outlets (Fig H).
3. Allow the engine to slow down and idle for approx 15-30 seconds.
4. Press the engine On/O switch (2) to the “OFF” position as indicated by an
“O” (Fig. S). The unit will stop running.
5. Turn the fuel lever / tap (23) clockwise to the “OFF” position (Fig. T).
NOTE: Turn o the fuel safety switch (34) if the engine still runs after operating
the above procedures (Fig. J1).
Overload procedure for restarting and resetting the engine
1. Turn “OFF” the 240Va.c Outlet Power On/O switch (1) by pushing the
switch to the right hand side. (Fig R).
R. S. T.
26


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Ferrex KF2000 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Ferrex KF2000 in the language / languages: English as an attachment in your email.

The manual is 3,51 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info