525643
43
Zoom out
Zoom in
Previous page
1/64
Next page
42 < < < <
6.6.1 Placing the imitation logs
Place the imitation logs. Make sure
that the logs are properly connected
to the tube burners.(see fig. 4.1 or
imitation logs instruction card
supplied)
Now divide the vermiculate pebbles
and the chips in the combustion
chamber. Avoid the covering of the
air vent(s).
Place the glass and check the fire
image.
6.6.2 Pebbles
Place the pebbles over the burner and
the bottom. Spread the pebbles
evenly to a double layer. The surface
of the pebbles may be very slightly
higher than the burner tube ( zie fig.
4.2)
Place the glass and check the flame
picture into the appliance
6.7 Checking the installation.
6.7.1 Checking the ignition of the pilot
burner, main burner.
Start the pilot and main burner according
to the instructions in the user’s manual.
Check whether the pilot light is
properly positioned above the main
burner and is not covered by chips, an
imitation log or pebbles.
Check the ignition of the main burner
at full mark or low mark.
(the ignition should take place
quickly and easily).
6.7.2 Checking for gas leakage.
Check all connections and joins for possible
gas leaks by means of a gas leak detector or
spray
6.7.3 Checking the burner pressure
and the pre-pressure
Check whether the burner pressure and the
inlet pressure measured agree with the data
indicated on the registration plate
Measuring the inlet-pressure:
Turn off the gas control tap.
Open the pressure gauge nipple A (see
figure 1.1 ) a few turns and connect
a pressure gauge hose to the gas
control valve.
Carry out this measurement when the
appliance is on at full gas mark and
when it is on the pilot light.
If the inlet pressure is too high you
are not permitted to connect the
appliance.
Measuring the burner pressure:
Only perform this measurement if the
inlet-pressure is correct.
Open the pressure gauge nipple B (see
fig. 1.1 ) a few turns and connect a
pressure gauge hose to the gas control
valve.
The pressure must agree with the
value indicated on the registration
plate. In case of deviations, get in
touch with the manufacturer.
* Close the pressure gauge nipples and
check these for gas leaks.
6.7.4 Checking the flame picture.
Allow the applaince to burn for at least 20
minutes at full and then check the flame
picture for:
7. Distribution of the flames
8. Colour of the flames
If either one or both points are
unacceptable, then check:
The positioning of the imitation logs
and/or the quantity of pebbles or
chips on the burner.
The connections of the Flue materials
for leakage (in case of blue flames)
Whether the correct flue restrictor
has been mounted
The outlet .
o Wall terminal is installed
correctly
o Roof terminal is fitted and
sited correctly
The flue system is correctly
calculated
6.8 Instructing the client
Recommend that the appliance be
serviced annually by a competent
person in order to guarantee a safe
use and a long lifespan.
Advise and instruct the client about
maintenance and cleaning of the
glass. Emphasize the risk of burning in
fingerprints.
Instruct the client about the
operation of the appliance and the
remote control unit, including the
43


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Faber Farum at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Faber Farum in the language / languages: English, German, Dutch, Danish, Norwegian as an attachment in your email.

The manual is 1,63 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info