Note: The product is supplied with
two anti-corrosion discs (one on the
outside and one on the inside of the
combustion chamber). They must
be removed during unpacking and
disposed of as normal waste.
16
ENGLISH
Counterweights
Counterweights installation
The latch hatch is equipped with counterweights
which guarantee both the closure and a soft
movement.
The action of the counterweights can be
adjusted by adding one or more washers
(additional counterweights) provided with the
chimney.
The additional counterweights (washers) can be
mounted at any time without dismantling the
chimney shell.
PROCEDURE.
1. Completely close the latch hatch
2. Rotate the hatch slide blocking lever.( n 35 -
esploso page 63 )
Open the glass door, proceed as indicated at
page 21 , as, for example, is necessary for the
cleaning of the glass
3. unhook the support profiles, left and right, of
the ecokeram hearth walls
4. remove the ecokeram hearth walls
5. At this point, the closing lids of the
counterweights inspection compartment will
remain visible.
Remove the lids of the counterweights
compartments by unscrewing the four screws.
6. Loosen and remove the M8 screw of the
counterweight door bar.
7. From the bottom, add the additional
counterweights on the base counterweight bar,
and fix them with the M8 screw which had just
been removed.
The same number of additional counterweights
is to be mounted on both sides.
8. Remount the sheet lids and reposition the
hearths walls.
9. Re-hook the fixing plates of the hearths walls.
10. Close the glass door. Do not forget to rotate
the door closing lever with the appropriate
handle! )
11. Unblock the hatch by rotating the slide
blocking lever (n 6 page 21) and verify the
sliding.
12. The hatch must slide with a soft movement,
remaining balanced.
13. Eventually further adjust the sliding by
symmetrically removing or adding the additional
counterweights (washers).
Premise
•The DOUBLE hearth must be installed
keeping to the following instructions, as the
safety and plant efficiency depend on the
correct installation.
•Carefully read the present instructions
before mounting.
•EDILKAMIN declines any responsibility for
eventual damages deriving from the non
compliance with the present instructions
and, in case, any warranty right will be
void.
•The DOUBLE hearth is supplied already
assembled on non returnable pallet.The
internal covering of the hearth is supplied
already installed
•A model identification label is applied
under the hearth panel; the label can be
seen until the hearth is covered. The model
identification number is indicated in the
documentation supplied with the product.
External air inlet
The connection with the outside
section equal 120 cm2 useful
passage (ø 12.5 cm) is absolutely
necessary for the good functioning
of the hearth, it must therefore be
realised.
In case of use for long periods with
hearth open, a supplementary air
inlet of a further 120 cm2 useful
passages, must be provided.
The 125 mm fitting to be installed on one
of the two sides and below the hearth, must
be directly connected with the outside.
The connection can be realised with
aluminium flexible pipe, being careful to
seal the points where air loss may verify.
It is advisable to apply a protection grill
to the outside of the air inlet conduit, but
which must not reduce the useful
passage section.
The external air must be captured at floor
level (it cannot come from above).
• Whenever the air volume is scarce and
the type of building in which the chimney
is installed particularly air sealed, it will be
necessary to install a supplementary air inlet
of 120 cm2 as said above
Important warnings
As well as that indicated in the present
document, bear in mind the UNI rules:
- n. 10683 - wood heat generators:
installation requirements
- n. 9615/90 - calculation of the
chimney internal dimensions.
In particular:
- before starting any mounting
operation, it is important to verify the
compatibility of the plant as established by
the UNI 10683 rule in paragraphs 4.1/
4.1.1 / 4.1.2.
- once mounted, the installer must
“start up” the plant and issue the
documentation requested in the UNI
10683 rule, respectively in paragraphs
4.6 and 5.
Before installing the cover, verify
the correct functioning of the
connections, the controls and all
moving parts.
The veri cation must be carried
out with the chimney having been
on for a few hours, before covering the
hearth, in order to eventually intervene.
Therefore, the finishing operations such as
for example:
- manufacture of the false hood
- mounting of covering
- carrying out stripping, painting, etc.must
be carried out once tested with positive
result.
Therefore, Edilkamin does not answer for
burdens deriving from both demolition
and reconstruction interventions, even if
subsequent to replacing hearth pieces
which resulted faulty.
INSTALLATION INSTRUCTIONS
16


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Edilkamin Double at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Edilkamin Double in the language / languages: English, German, Dutch, French, Italian, Spanish as an attachment in your email.

The manual is 0.93 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info