798227
22
Zoom out
Zoom in
Previous page
1/52
Next page
EN-6 452163.66.69 · FD 0010 www.glendimplex.de
English HPL 6S-TUW2
6.2 Condensate pipe
Condensed water that forms during operation must be drained
off frost free. To ensure proper drainage, the heat pump must
be mounted horizontally. The condensate pipe must have a
minimum diameter of 50 mm and must be fed into a sewer in
such a way that it is safe from frost. Do not discharge the con-
densate directly into clearing tanks or cess pits. The aggressive
vapours and a condensate pipe laid in an area which is not
frost-free can destroy the evaporator.
ATTENTION!
!
!
The frost line can vary according to the climatic region. The
regulations of the countries in question must be observed.
7 Assembly
7.1 General
The following connections need to be established on the heat
pump:
Flow and return of the heating system
Control lines to the heat pump manager
Voltage supply
Condensate drain
All panelling can be removed to allow accessing the inside of
the device.
Loosen the screws for this purpose. The panels can be removed
toward the top when slightly tilted.
7.2 Connection on heating side
The heating system connections on the heat pump are to be
made inside the device. Refer to the device information for the
connection sizes. Route the connection hoses out of the device
in a downwards direction. An optional pipe kit is available as an
accessory, which can be used to lead the connections out to
the side. Use a spanner to firmly grip the transitions when con-
necting the heat pump.
Before connecting the heating water system to the heat pump,
the heating system must be flushed to remove any impurities,
residue from sealants, etc. Any accumulation of deposits in the
liquefier could cause the heat pump to completely break down.
Once the heat pump has been connected to the heating sys-
tem, it must be filled, de-aerated and pressure-tested.
Frost line
Condensate drain
Flow and return
Electric cables
Heat pump
0,20 m
Control and main cables
Opening the cover panels Closing the cover panels
Pipe kit
optional
22


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Dimplex HPL 6S-TUW2 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Dimplex HPL 6S-TUW2 in the language / languages: English, German, French as an attachment in your email.

The manual is 2.2 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info