648457
6
Zoom out
Zoom in
Previous page
1/8
Next page
8 • EN
STEP 1 DESULPHATION
Detectssulphatedbatteries.Pulsingcurrentandvoltage,removessulphatefromthelead
platesofthebatteryrestoringthebatterycapacity.
STEP 2 SOFT START
Testsifthebatterycanacceptcharge.Thissteppreventsthatchargingproceedswitha
defectbattery.
STEP 3 BULK
Chargingwithmaximumcurrentuntilapproximately80%batterycapacity.
STEP 4 ABSORPTION
Chargingwithdecliningcurrenttomaximizeupto100%batterycapacity.
STEP 5 ANALYSE
Testsifthebatterycanholdcharge.Batteriesthatcannotholdchargemayneedtobereplaced.
STEP 6 RECOND
Choose theRecondprogramtoaddtheRecondsteptothechargingprocess.DuringtheRecondstep
voltageincreasestocreatecontrolledgasinginthebattery.Gasingmixesthebatteryacidandgives
backenergytothebattery.
STEP 7 FLOAT
Maintainingthebatteryvoltageatmaximumlevelbyprovidingaconstantvoltagecharge.
STEP 8 PULSE
Maintainingthebatteryat95–100%capacity.Thechargermonitorsthebatteryvoltageandgivesa
pulsewhennecessarytokeepthebatteryfullycharged.
1
VOLTAGE (V)CURRENT (A)
ANALYSE RECOND PULSE
DESULPHATION SOFT START BULK ABSORPTION
15.8V
Increasing voltage
to 14.7V @ 25°C
10A
10A until 12.6V Increasing voltage
to 14.4V @ 25°C
10A
1
7
Limit:
Max 20h Max 10h 3 minutes
30 min or 4h
depending on
battery voltage
10 days
Charge cycle restarts
if voltage drops*
Charge cycle restarts
if voltage drops
Max 8h
15.8V
15.8V 10A until 12.6V
10A until 12.6V
Increasing voltage
to 14.4V @ 25°C
10A
14.4V @ 25°C
Declining current
14.7V @ 25°C
Declining current
14.4V @ 25°C
Declining current
Checks if voltage
drops to 12V
Checks if voltage
drops to 12V
Checks if voltage
drops to 12V
Max 13.6V
10A
13.6V
10A
13.6V
10A
13.6V
10A
12.7V‒14.4V
10‒2A
12.7V‒14.7V
10‒2A
12.7V‒14.4V
10‒2A
Max 8h
2 3 4 5
FLOAT
6 8
RECOND
SUPPLY
AGM
Max 15.8V
1.5A
*Supply program is not time or voltage limited.
CHARGING PROGRAM
6


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Ctek MXS 10 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Ctek MXS 10 in the language / languages: English as an attachment in your email.

The manual is 0,69 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Ctek MXS 10

Ctek MXS 10 User Manual - German - 8 pages

Ctek MXS 10 User Manual - Dutch - 8 pages

Ctek MXS 10 User Manual - French - 8 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info