816489
17
Zoom out
Zoom in
Previous page
1/33
Next page
Asphalt and concrete cutter RVZ-500 Operation
manual
page 17 issued 10/2002
5. MAINTENANCE SCHEDULE
This maintenance schedule contains only the most important operations. Besides of these operations, carry out maintenance and repairs of the machine as necessary
depending on the respective conditions of operation. Check also the engine operation manual.
WARNING:
Turn off the engine before any maintenance or repair activity.
Use genuine spare parts only. Use of non-original spare parts may lead to damage to the machine. The manufacturer will not honor any warranty claim
arising from such reason.
Item Operation Initial inspection After 1st month or 20
hrs.
Every 3 months or 50
hrs.
Every 6 months or
100 hrs.
Engine oil
Inspection of oil level
DAILY (3)
Exchange
Air filter
Inspection
DAILY (1)
Cleaning
If necessary (1)
Spark plug (gasoline
engines)
Inspection - cleaning
Filter bowl
Cleaning
Fuel hose
Inspection - Exchange
Every two years
Valve clearance
Inspection - adjustment
Every 12 months or 300 hrs. (2)
Fuel tank and sieve
Cleaning
Every 12 months or 300 hrs. (2)
Drive belt
Tensioning
Handle assembly
Lubrication
1. To be carried more often when operating in dusty environment!
2. It is recommended to be carried out by authorized service agent.
3. Use the dipstick for oil level inspection (supplied with every machine as an accessory)
17


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Carat VZ-500 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Carat VZ-500 in the language / languages: English as an attachment in your email.

The manual is 1.94 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info