696853
47
Zoom out
Zoom in
Previous page
1/72
Next page
IDRO PRINCE
3
12-16-23-23 H
2
O - IDRO PRINCE 30-30 H
2
O - AQUOS
3
16-23-23 H
2
O - IDRON 16-22 AIRTIGHT - MIRA 16-22 -
TESIS 16-23
AIRTIGHT - HIDROFIRE 22.8
47
Scroll to “Pellet recipe using the arrows.
Press menu to confirm.
Modify the % with the + - keys.
Press menu to confirm and esc to exit
k - Smoke rpm % ventilation
If the installation presents difficulties for smoke evacuation (no draught or no pressure in the duct), the smoke and ash expulsion
speed can be increased. This change resolves all the potential problems related to pellets clogging in the brazier and deposits
forming at the bottom of the brazier itself caused by poor quality fuel or fuel that produces a lot of ashes. The values available are
from -30% to +50% with variations of 10 percentage points at a time. The variation in negative can be used in case the flame is
too low.
To change the parameter act as follows:
Press the menu button.
Scroll to “Settings” using the arrows
Press menu to confirm.
Scroll to “Smoke rpm variation using the arrows.
Press menu to confirm.
Modify the % with the + - keys.
Press menu to confirm and esc to exit
l - Maximum power
It allows to set the maximum flame limit at which the boiler can operate to reach the set temperature target.
To change the power act as follows:
Press the menu button.
Scroll to “Settings” using the arrows
Press menu to confirm.
Scroll to “Maximum power” using the arrows.
Press menu to confirm.
Change the power from 01 to 05 with the + - keys
Press menu to confirm and esc to exit
m - Components test
It can only be carried out with the boiler switched off, it allows to select the components to be tested:
Spark plug: it is turned on for a fixed time of 1 minute during which the panel displays the countdown seconds.
Feed screw: it is powered for a fixed time of 1 minute during which the panel displays the countdown seconds.
Extractor: it is activated at 2500 rpm for a fixed time of 1 minute during which the panel displays the countdown seconds.
Exchanger: it allows to carry out the test in V5 for a fixed time of 1 minute during which the panel displays the countdown
seconds.
Pump: it is activated for a fixed time of 10 seconds during which the panel displays the countdown.
3 way: the 3 way valve is activated for a fixed time of 1 minute during which the panel displays the countdown seconds.
To activate the “Components test” function (only when the boiler is switched off) act as follows:
Press the menu button.
Scroll to “Settings” using the arrows
Press menu to confirm.
Scroll to “Components test” using the arrows.
Press menu to confirm.
Select the test to be performed with the + - keys
Press menu to confirm and esc to exit
n - Chimney sweep function
This function can be activated only when the boiler is on and with power output and heating operation power with parameters
P5, with fan (if present) in V5. Any loading/smoke ventilation percentage corrections must be taken into account. This status lasts
20 minutes, the countdown is displayed on the panel. During this interval the thermostat/puffer/room set point/H20 set point are
not taken into account, only the safety shutdown at 85°C remains active. At any time the technician can interrupt this stage by
quickly pressing the on/off key.
To activate the “Chimney sweep function act as follows:
Press the menu button.
47


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Cadel MIRA 22 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Cadel MIRA 22 in the language / languages: English as an attachment in your email.

The manual is 2,7 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Cadel MIRA 22

Cadel MIRA 22 User Manual - German - 76 pages

Cadel MIRA 22 User Manual - Dutch - 72 pages

Cadel MIRA 22 User Manual - French - 72 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info