4.6 Gas supply piping
Verify that the type and the pressure of the gas supplied correspond with
those required for the boiler. When eld converting the boiler from Natural
to LP gas be sure to adhere the new gas label on the boiler.
The minimum and maximum pressure for natural gas are 3.5” W.C. (8.72
mbar) and 10.5” W.C. (26.15 mbar) respectively.
The minimum and maximum pressure for LP gas are 8” W.C. (19.9 mbar)
and 13” W.C. (32.3 mbar) respectively.
4.6.1 Connection of gas supply piping
Connect the gas supply to the unit as follows:
Install a ground joint union for servicing as required.
Install a manual shutoff valve in the gas supply piping
Install a sediment trap/ drip leg
Purge all air from the gas supply piping.
Before placing the appliance in operation, check the appliance and its
gas connection.
Check the appliance and its gas connection with a leak test before
placing in operation.
WARNING: Gas piping must be supported with proper
hangers and not from the boiler itself or its devices and
accessories.
DANGER: Never use an open ame to test for gas leaks.
Always use an approved leak detection method.
WARNING: Failure to properly apply pipe sealing
compound can result in severe personal injury, death, or
substantial property damage.
The Commonwealth of Massachusettes prohibits the use of copper tubing
for the gas line.
4.6.2 Gas type conversion
DANGER: Personal injury and property damage.
This conversion shall only be performed by a trained and
certied installer in accordance with the manufacturer‘s
instructions and all applicable codes and requirements
of the authority having jurisdiction.
If the information in these instructions is not followed
exactly, or the installation, adjustment, modication,
operation or maintenance is carried out by an
unqualied person, a re, explosion or generation of
large amounts of carbon monoxide may result causing
property damage, personal injury or loss of life.
Before carrying out electrical work: Disconnect the
appliance from the power supply at the emergency
shutoff switch or by disengaging the heating system
circuit breaker. Take appropriate measures to prevent
accidental reconnection.
The installer is resp onsible for the proper conversion of
this appliance.
The conversion is not complete until the operation of the
converted appliance is checked as specied in these
instructions.
The gas-air ratio must always be set on the basis of a CO
2
or O
2
reading taken at maximum nominal output and minimum nominal
output using an electronic ue gas analyzer.
LP conversion kit installation (SSB255)
Natural Gas to LP conversion
The heating unit is factory preset for operating with natural gas. This
set-up can be changed using the conversion kits supplied by the
manufacturer.
NOTICE: This change may only be performed by a qualied
installer or service technician, according to the following
procedure.
Switching from NATURAL GAS to LP
Close the gas cock
Disconnect the electric power supply from the boiler
WARNING: to avoid electrical shock, it is mandatory to
disconnect the boiler from the power supply using a service
disconnect external switch.
Remove the front panel
Unscrew the 3 screws ‘A and the swivel joint ‘B’ indicated in Fig. 22 to
separate the valve from the fan
Separating the two components, you can see the hole where the gas
passes with its gasket
Insert the provided metal orice ‘C’ into the gasket “D” without
removing the gasket itself
Check the condition of the gasket ‘E’. Replace if necessary
Tighten the swivel joint ‘B’
Tighten the 3 screws ‘A
Switch the main power supply to ON
Fig. 22
NOTICE: Make sure there is no demand or call for heat.
Use the control panel to enter in the parameter list and change the
parameter N° 98 (Gas Type) from “NG” to “LPG”
Reopen the gas shut-off cock
Adjust the CO
2
parameter as explained in chapter “5.7 Adjusting
and setting CO2 limits” (see “Tab. 17 Number of turns for gas valve
settings”)
Afx the gas type label from the gas conversion kit to the appliance
(Fig. 24).
A BC ED
22


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Buderus SSB512 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Buderus SSB512 in the language / languages: English as an attachment in your email.

The manual is 9,92 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Buderus SSB512

Buderus SSB512 Installation Guide - French - 68 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info