636468
27
Zoom out
Zoom in
Previous page
1/68
Next page
SSB 6720818454 (2016/02) US
Installation | 27
Pipe diameter per boiler
Material Item Standard [USA]
Standard
[Canada]
SSB
255
SSB
399
SSB
512
PVC schedule 40,
80
1
Flue gas or
combustion air
ANSI/ASTM D1785
BH Gas venting
systems,
ULC S636
2
,
Class IIA - PVC,
Class IIB - CPVC,
Class IIC -
Polypropylene
3” (80mm)
4” (100mm)
3” (80mm)
4” (100mm)
4” (100mm)
PVC-DWV
Flue gas or
combustion air
ANSI/ASTM D2665
3” (80mm)
4” (100mm)
4” (100mm) 4” (100mm)
CPVC schedule
40, 80
Flue gas or
combustion air
ANSI/ASTM F441
3” (80mm)
4” (100mm)
4” (100mm) 4” (100mm)
PP
Flue gas or
combustion air
ANSI Cat IV
Approved
Polypropylene
3” (80mm)
4” (100mm)
4” (100mm)
5” (130mm)
4” (100mm)
5” (130mm)
PP-Flex
Flue gas or
combustion air
ANSI Cat IV
Approved
Polypropylene
3” (80mm)
4” (100mm)
4” (100mm)
5” (130mm)
4” (100mm)
5” (130mm)
Stainless Steel
AL29-4C
Flue gas or
combustion air
UL1738
3” (80mm)
4” (100mm)
4” (100mm)
5” (130mm)
4” (100mm)
5” (130mm)
PVC
Pipe cement/
primer
ANSI/ASTM D2564 X X X
CPVC
Pipe cement/
primer
ANSI/ASTM F493 X X X
Tab. 4 Approved Flue gas or combustion air materials and ttings per boiler
1 PVC must not be used for vent material when a glycol mixture is used in the boiler circuit.
2 Components of the certied vent systems must not be interchanged with other vent systems or unlisted pipe ttings. Plastic components, and specied
primers and glues of the certied vent system must be from a single system manufacturer and not intermixed with other system manufacturer’s vent
system parts. For installations in Canada, eld supplied plastic vent piping must comply with CAN/CSA B149.1 (latest edition) and be certied to the
Standard for Type BH Gas Venting systems. ULC S636.
The supplied vent connector and separate available vent terminations are certied as a part of the boiler.
Standard straight pipes, 90°-elbows or Tees are approved as roof or wall terminations in all the approved materials. Furthermore the following terminations
are approved. For details please refer to the supplier’s information.
Roof Terminal Material Supplier Part Number
3” (125 mm)
4” (100mm)
Concentric kits
PVC or CPVC
IPEX System 636
Type IIa & IIb
196006 (PVC), 197009 (CPVC)
196021 (PVC), 197021 (CPVC)
3” / 5” (80/125 mm)
concentric
PP
M&G Duravent PolyPro
or
Centrotherm InnoFlue
3PPS-VKL (M&G Duravent)
or
ICRT3539 (Centrotherm)
4”/6” (100/150 mm)
Concentric
PP
M&G Duravent PolyPro
or
Centrotherm InnoFlue
4PPK-VKL (M&G Duravent)
or
ICRT 4679 (Centrotherm)
3” (80 mm)
Chimney Cap
PP Flex
M&G Duravent PolyPro
or
Centrotherm InnoFlue
3PPS-FKL (M&G Duravent)
or
ISCP03 (Centrotherm)
4” (100 mm)
Chimney Cap
PP Flex
M&G Duravent - PolyPro
Centrotherm - Innoue
SW Flex
4PPS-FKL (M&G Duravent)
or
ISCP04 (Centrotherm)
5” (130 mm)
6” (150 mm)
8” (200 mm)
Vertical termination for commercial
systems
PP M&G Duravent - PolyPro
5PPS-VTM
6PPS-VTM
8PPS-VTM
Tab. 5 Roof terminals
27


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Buderus SSB399 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Buderus SSB399 in the language / languages: English as an attachment in your email.

The manual is 9,92 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Buderus SSB399

Buderus SSB399 Installation Guide - French - 68 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info