636468
25
Zoom out
Zoom in
Previous page
1/68
Next page
SSB 6720818454 (2016/02) US
Installation | 25
4.7.2 Connecting ue gas systems
Optional vent systems are:
Twin pipe, concentric pipe and 1 pipe using room air
Approved materials PVC, CPVC, Stainless Steel, PP and PP-Flex
(M&G Duravent PolyPro and Centrotherm InnoFlue)
Sealed combustion or room air intake
Terminations can be either horizontal or vertical
The diameters of the ue outlet and combustion air intake inlet are
designed to t standard PP, PVC, CPVC and stainless steel pipes.
The following table gives the diameter of the ue adapter on the
boiler.
Boiler SSB255 SSB399 SSB512
Diameters 3” - 80mm 4” - 100mm 4” - 100mm
Tab. 3
Insert the exhaust pipe and the air intake pipe as shown in the following
gure:
Fig. 26
Insert the ue exhaust pipe “A” completely into the adapter and tighten
the clamp “B” present in the ue exhaust adapter.
Insert the air intake pipe “C” completely into the adapter and tighten the
clamp “D” present in the air intake adapter.
The correct ow direction into two pipes is shown in Fig. 27.
Fig. 27
4.7.3 Installation of the exhaust and air intake system
NOTICE: Do not extend exposed vent pipe outside the
building beyond recommended distance of 39” or 1 meter.
Condensate could freeze and block vent pipe
Vent should terminate at least 3 feet (915 mm) away from adjacent walls,
inside corners and 5 feet (1525 mm) below roof overhang ( [X2], [X4], see
Fig. 28)
C
A
B
D
25


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Buderus SSB399 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Buderus SSB399 in the language / languages: English as an attachment in your email.

The manual is 9,92 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Buderus SSB399

Buderus SSB399 Installation Guide - French - 68 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info