30 | Commissioning
SB625WS/SB745WS6 720 805 218 (2016/02)
6.7 Filling the heating system
The fill and top-up water quality must comply with the water
requirements in this manual.
The pH value of the heating water increases after the heating system has
been filled. After 3 – 6 months (initial service) check whether the pH
value of the heating water has settled down.
Adjust the pre-charge pressure of the expansion vessel to the
required pressure (only for sealed unvented systems).
Open the shut-off valves on the heating water side.
Fill the heating system slowly and observe the pressure gauge whilst
doing so.
Vent the heating system via the radiator air vent valves.
If the water pressure drops as a result of venting the system:
Top up the system with water.
Carry out a leak test in accordance with locally applicable
regulations.
After the tightness test, reinstate all components that were taken out
of operation.
Ensure that all pressure, control and safety equipment is functioning
correctly.
Once the boiler has been tested for tightness and no leaks have been
found:
Set the correct operating pressure. The working pressure in the
heating system should be over 14 PSI but below the maximum limit
specified for the boiler.
Close the automatic air vent valve.
6.8 Preparing the heating system for operation
Observe the following points during commissioning:
The turbulators [2] are correctly positioned (horizontal) inside the
heat exchanger tubes and the clips [1] are resting against the wall [3]
of the heat exchanger.
Fig. 31 Heat exchanger tube
[1] Clip
[2] Turbulator
[3] Wall
Before commissioning, vent the heating system via the ventilation
facilities provided for this purpose.
Check that the inspection aperture on the flue gas collector is closed.
Check that the combustion chamber door is securely closed.
Check that the safety equipment (e.g. safety valve, minimum and
maximum pressure limiters, high limit safety cut-out) is functioning
correctly.
Check that the required operating pressure has been achieved.
Check the flange connections and other connections for tightness.
Check the control unit connections and temperature sensor
positions.
Fill the condensate siphon.
6.9 Commissioning the control unit and burner
By commissioning the control unit you automatically commission the
burner as well. The burner can then be started by the control unit. For
further information, see the installation instructions of the relevant
control unit or burner.
Use the control unit to commission the boiler.
Set the control unit parameters ( chapter 6.10, page 30).
Complete the commissioning report in the technical documentation
of the burner.
6.10 Setting control unit parameters
The controller settings listed in table 15 apply to the Logamatic 4321
control unit.
For further information on setting the control unit, see chapter 6.1,
page 26.
CAUTION: Health risk through contaminated drinking
water.
Observe all country-specific regulations and
standards regarding the prevention of drinking water
contamination.
NOTICE: System damage through temperature
stresses.
Only fill the heating system when cold (the flow
temperature must not exceed 104 °F (40 °C)).
During operation, only fill the heating system via the
fill valve in the heating system pipework (return).
Open the automatic air vent valve only briefly for venting.
Control unit setting
Burner
Burner type
for fuel gas
Burner type to
be selected
Fuel to be
selected
Single fuel
burner
Modulating Modulating Gas
2-stage
2-stage Gas
Table 15 Controller settings for Logamatic 4321 control unit
2
3
1
6 720 805 218-33.1T
30


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Buderus SB625WS at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Buderus SB625WS in the language / languages: English as an attachment in your email.

The manual is 3,62 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Buderus SB625WS

Buderus SB625WS User Manual - English - 12 pages

Buderus SB625WS Installation Guide - French - 56 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info