Commissioning | 29
6 720 805 218 (2016/02)SB625WS/SB745WS
Fig. 29 Securing a cable with a cable clip
Secure all cables with cable clips (part of the control unit standard
delivery) or sleeve in a conduit (if required by code). Perform the
following steps to secure the cables:
Insert the cable clip together with the cable from the top into the slot
in the frame.
Slide the cable clip downwards.
Counterhold.
Flip the lever up.
Fit the back panel.
Refit the cover to the control unit.
Fix the control unit cover with the screws supplied.
6.5 Fitting temperature sensors
The boiler test point is at the top of the boiler body ( Fig. 27 , [1],
page 28).
Measure the depth of the sensor well.
Mark the depth on the temperature sensor set
(lead).
Insert the temperature sensor set as far as it will go into the test
point (to the bottom).
Use the mark to check whether the temperature sensors are
correctly fitted.
Secure the temperature sensor set in the test point with a sensor
retainer.
The plastic coil [2] for keeping the temperature sensors together is
pushed back automatically when it is inserted.
Fig. 30 Inserting the plastic coil into the sensor well
[1] Compensating spring
[2] Plastic spiral
[3] Sensor retainer
[4] Sensor well
Never kink excess lengths of capillaries.
Route the sensor lead through the cable conduit to the control unit.
Connect the sensor lead to the control unit
Complete the commissioning report ( chapter 6.11, page 31).
6.6 Flushing the heating system
To prevent contamination in the boiler, flush the heating system prior to
commissioning.
Flush the system prior to connection to the boiler.
-or-
Isolate the heating flow and return at the boiler.
Connect the heating flow to a water connection.
Connect hose to the heating return of the heating system.
Route hose from the heating return to a drain.
Open connected consumers (e.g. radiators).
Flush the heating system with fresh water until clear water emerges
from the heating return.
Drain the heating system.
NOTICE: System damage through damaged capillaries
or incorrectly fitted temperature sensor.
Ensure that the capillaries are neither kinked nor
squashed when uncoiling and routing them.
Always push the temperature sensor right to the
bottom of the sensor well.
NOTICE: System damage due to incorrect sensor
position!
The safety cut-out (STB) and thermostat (TR) sensors of
the Logamatic 4321 control unit must be fitted at the
installation site ( picture 27, [1], page 28) on the top
of the boiler.
In the case of third party control units, safety cut-out
and thermostat sensors of third party control units
must be fitted in the instrument bulb/probe socket of
the heating supply ( Fig. 1,[6], page 5) of the
boiler.
Do not change the length of the immersion sleeve.
Standard immersion sleeve used: 3/4"
6 720 615 362-20.1SL
Insert compensating spring [1] between the
temperature sensors to ensure a good contact between
sensor well [4] and sensor surfaces, and thereby a
reliable temperature transfer.
If the heating system contains several heating circuits,
these must be flushed one after the other.
6720615883-32.1RS
1
2
3
4
29


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Buderus SB625WS at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Buderus SB625WS in the language / languages: English as an attachment in your email.

The manual is 3,62 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Buderus SB625WS

Buderus SB625WS User Manual - English - 12 pages

Buderus SB625WS Installation Guide - French - 56 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info