26
EN
2 / INSTALLING YOUR APPLIANCE
ASSEMBLING THE VENTILATION
SHAFT
••
Outdoor evacuation
- Calculate the final height for fixing the duct sup-
port U-bracket (part B Pic. 1)
- Mark the two holes accordingly
- Drill 8 mm diameter holes and secure the duct
support bracket, ensuring that it is fixed on the
same axis as the hood (oart B Pic 1)
- Fix the flat bracket behind the lower duct. (part
C Pic. 4)
- Place the glass on the guides. Slide the glass in
and secure it with the 4 screws with rubber seal
(glass safety). Tighten the screws slightly
--Fix the two ducts to the hood.
- Connect the sleeve to the air outlet to the out-
side.
- Make the electrical connection to the hood
using the mains supply cable.
- Lift the upper duct up to the ceiling and fix it to
the bracket using the screws.
••