693646
3
Zoom out
Zoom in
Previous page
1/30
Next page
- 3 -
Table of Contents
1. Boiler use and advantages ................................................................................................................. 4
2. Technical specifications...................................................................................................................... 4
3. Specified fuel ...................................................................................................................................... 5
4. Boiler description ................................................................................................................................ 6
4.1. Boiler design.................................................................................................................................... 6
4.2. Control and safety elements of the boiler...................................................................................... 13
4.3. Boiler accessories.......................................................................................................................... 13
5. Boiler placement and installation...................................................................................................... 14
5.1. Regulations and directives............................................................................................................. 14
5.2. Boiler placement options ............................................................................................................... 16
6. Commissioning of the boiler - instructions for contracted service organizations.............................. 18
6.1. Electrical connection via connectors.............................................................................................. 18
6.2. Connection of the boiler to the heating system.............................................................................. 19
6.3. Installation of ceramics into the boiler ........................................................................................... 20
6.4. Verification activities before start-up.............................................................................................. 21
6.5. Putting into operation..................................................................................................................... 22
7. Boiler operation by user.................................................................................................................... 22
7.1. Making fire in the boiler.................................................................................................................. 23
7.2. Boiler operation.............................................................................................................................. 23
7.3. Boiler shutdown ............................................................................................................................. 23
7.4. Residual risks and their prevention................................................................................................ 24
8. Boiler maintenance........................................................................................................................... 25
9. Troubleshooting................................................................................................................................ 26
10. Guidelines for sustained compliance with the environmental parameters of the product ............... 28
11. Instructions for product disposal after the end of its service life...................................................... 28
12. Guarantee and liability for defects ................................................................................................... 28
3


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Benekov S100 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Benekov S100 in the language / languages: English as an attachment in your email.

The manual is 1,02 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info