810549
7
Zoom out
Zoom in
Previous page
1/28
Next page
| 7
CAST IRON FLOOR STANDING GAS BOILER
If there is a danger of approach of inflammable (explosive) gases or fumes to the boiler (e.g. by
PVC application), it must be put out of operation early including the burning flame (EKO, PLQ, P).
SAFETY CONDITIONS
When installing a boiler, a safe distance of its surface from inflammable materials depending on
the degree of flammability must be kept. Distances:
yfrom inflammable materials of B, C1, C2 categories 200 mm
yfrom inflammable materials of C3 category 400 mm
yfrom materials not tested by STN 73 0853 400 mm
EXAMPLES OF CLASSIFICATION OF THE BUILDING MATERIALS BY THE INFLAM
MABLE LEVEL:
yA category non-combustible (brick, blocks, concrete, tiles, mortar, plaster)
yB category very difficult to ignite (heraklit, lignos, basalt boards)
yC1 category difficult to ignite (beech, oak, wood-fibre, werzalit, cardboard)
yC2 category normally flammable (pinewood, solodur)
yC3 category easily flammable (wood-fibre boards, polyurethan, PVC, styrofoam)
If a boiler stands on the floor made from flammable materials, it must be protected by incombus-
tible insulating plate exceeding boiler dimensions for at least in 150 mm. Solid materials of the A
category can be used as incombustible and insulating materials. Objects from flammable materials
cannot be placed on the boiler nor in the distance shorter than 500 mm.
CONDITIONS TO KEEP THE ECOLOGICAL PARAMETERS
The boiler is set up and tested by the producer to ensure the optimum process of burning in line
with the ecological requirements. The boiler must be installed into the dry and dustless environ-
ment, without possibility to suck strange, aggressive materials or fogs through the air supply. Ask
the specialized company to take care about the the flue gas exhaust. It is necessary to make the
annual tests and cleaning.
TECHNICAL DESCRIPTION EKO, PLQ, KLV, KLQ, E, EZ, P TYPES:
The body of boilers consists of cast-iron elements with the system of exchanger ribs, where the
flue gas go into the collector and through draught breaker into the chimney. The pipes with screw
joints 1“ or 6/4“ (S, P) have to be connected to the heating system on the rear side of the body. In the
upper front in a copper sleeve there are emergency thermostat and sensors of boiler thermostat
and thermomanometer. In the rear bottom part there is the inlet and outlet valve and in the front
upper part there is a reverse valve with a sensor of the pressure gauge.
The boiler body is insulated by insulating material preventing the heat leakage into surround-
ings. The front wall is covered by protective metal sheet. After demounting the boiler skeleton and
draught breaker, it is possible to get to the combustion chamber, to check or to clean the exchang-
7


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for ATTACK KLQ at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of ATTACK KLQ in the language / languages: English as an attachment in your email.

The manual is 1.22 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info