519989
20
Zoom out
Zoom in
Previous page
1/170
Next page
19
F
F
u
u
e
e
l
l
l
l
i
i
n
n
g
g
o
o
f
f
t
t
h
h
e
e
d
d
e
e
v
v
i
i
c
c
e
e
Stop the engine and allow it to cool down.
Wear protective gloves.
Avoid eye and skin contact.
Strictly follow the instructions under ”Safe
handling with fuels”.
 Clean the area around the filler neck. Contamination in the
tank may result in malfunction.
Â
Carefully open the tank cap (20) to allow possible
overpressure to relax.
 Shake the container once more before pouring the fuel
mixture into the tank.
 Carefully fill the fuel mixture up to the lower edge of the filler
neck. Avoid spilling of fuel or oil. Clean the device
immediately when you have spilled fuel or oil.
Make sure that no fuel can come into the soil.
 Carefully close the tank cap after fuelling and check that it
does not get loose during operation.
 Check that there is no leakage on the tank cap and fuel
lines. If there are leaks this product may not be started.
 Clean the tank cap and the area around it.
Go away at least three metres from the fuelling place to
start the chain saw.
S
S
t
t
a
a
r
r
t
t
-
-
u
u
p
p
Check that the machine is completely and correctly
assembled.
Before each use, check
the correct assembly of the drill
- the machine for possible damage
- loose fastenings
Â
Make sure that the ON/OFF switch, the throttle lock-out
switch, the throttle trigger and the machine properly work.
LThe engine of the machine is supplied without gasoline
and oil in it. Fuel the device as described under ”Fuelling”.
When starting make sure that the drill can freely rotate.
S
S
t
t
a
a
r
r
t
t
i
i
n
n
g
g
w
w
i
i
t
t
h
h
c
c
o
o
l
l
d
d
e
e
n
n
g
g
i
i
n
n
e
e
 Firmly press on the fuel pump (12) several times until
petrol (gasoline)/foam is visible in the priming pump.
 Put the choke lever (13) to OFF .
 Put the ON/OFF switch (10) to
.
 Press the throttle lock-out switch (8) and operate the throttle
trigger (9) at the same time.
Â
Lock the throttle lever using the locking pin (11).
Â
Grasp the cranking handle (14) and slowly pull the
cranking rope until a resistance is felt. Then, pull quickly
and firmly.
Do not fully pull out the cranking rope and slowly
guide the cranking handle back to make sure that
the cranking rope is correctly wound up.
Repeat this operation until the engine starts.
Â
Put the choke lever (13) halfway back when the engine
has started.
L
The engine will idle when you release the throttle
trigger.
Â
When the engine runs smoothly put the choke lever
(13) to ON.
 Allow the engine to warm up for 30 seconds before starting
your work.
S
S
t
t
o
o
p
p
p
p
i
i
n
n
g
g
t
t
h
h
e
e
e
e
n
n
g
g
i
i
n
n
e
e
 Release the throttle trigger (9).
Put the ON/OFF switch (10) to the position
.
S
S
t
t
a
a
r
r
t
t
i
i
n
n
g
g
w
w
i
i
t
t
h
h
w
w
a
a
r
r
m
m
e
e
n
n
g
g
i
i
n
n
e
e
Start the device as described under “Starting with cold engine”,
but leave the choke lever in its operating position ON and do
not operate the throttle trigger.
W
W
o
o
r
r
k
k
i
i
n
n
g
g
i
i
n
n
s
s
t
t
r
r
u
u
c
c
t
t
i
i
o
o
n
n
s
s
You may not start to operate the machine until you
have read these operating instructions, observed all the
instructions given and installed the machine as described!
W
W
o
o
r
r
k
k
i
i
n
n
g
g
w
w
i
i
t
t
h
h
t
t
h
h
e
e
e
e
a
a
r
r
t
t
h
h
a
a
u
u
g
g
e
e
r
r
Only use auger drills recommended by the manufacturer.
Pay attention to the max. diameter.
Put your feet shoulder-width apart and firmly grasp the earth
auger on both handles.
Start the drilling with "half throttle" and gradually increase
the speed so that the drill penetrates into the soil without
any problems.
Drill holes without exerting too much body weight on the
auger. Allow the auger to advance by its own weight.
If the auger drill is jammed in the soil and cannot be pulled
out, stop the engine and turn the earth auger
counterclockwisely.
The clutch may still slip during the run-in time of approx. 2
operating hours. Make sure that the clutch is free from oil or
moisture.
20


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Atika ELB 52 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Atika ELB 52 in the language / languages: English, German, Dutch, Danish, French, Italian, Polish as an attachment in your email.

The manual is 3,92 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Atika ELB 52

Atika ELB 52 Installation Guide - English, German, Dutch, Danish, French, Italian, Polish - 6 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info