3-phase connection (3 a.c. 230 V / 50 Hz):
The voltage between the phases and the neutral is 230 V a.c.
Install connecting bridges between the connection points 4-5. Your
groups must be fused with at least 16 A (3x). The connecting power
cable must have a minimum core cross section of 2,5 mm
2
.
You can use the bridges provided on the connecting block to make the
required interconnections as indicated in the preceding illustrations. How
to install the bridges is indicated in the junction box cover and in the
illustration below. The bridges should not be placed immediately on top
of the connecting wires, but between the screw-head and the clamp
around the connecting wire.
Secure the cable with the strain relief and close the cover.
Safety prescriptions
For the appliance to work well, it is important:
That there is sufficient ventilation to allow the hob to cool down, in
accordance with the possibilities specified in this chapter.
The ventilation air drawn in by the hob must not be warmer than
35 °C. Bear this in mind if the oven is to be built in under the hob.
That the connecting cable hangs freely and is not caught by a drawer.
The worktop should be a minimum of 2.8 cm and a maximum of
5 cm thick.
The worktop is flat.
INSTALLATION safety prescriptions
2 lives with 1 neutral connection (2 1N a.c. 400 V / 50 Hz):
The voltage between the phases and the neutral is 230 V a.c. Between the
lives there is a voltage of 400 V. If there is not a voltage of 400 V
between the lives, two wires have been taken from the same live in
the meter cupboard and the hob must be connected with two neutral
wires, as indicated above under 2 lives with 2 neutrals. Install a
connecting bridge between the connection points 4-5. Your groups must
be fused with at least 16 A (2x). The connecting power cable must have a
minimum core cross section of 2,5 mm
2
.
3 lives with 1 neutral connection (3 1N a.c. 400 V / 50 Hz):
The voltage between the phases and the neutral is 230 V a.c. There is a
voltage of 400 V between the lives. Fit a connecting bridge between the
connection points 4-5. Phase 3 carries no load. Your groups must be
fused with at least 16 A (3x). The connecting power cable must have a
minimum core cross section of 2,5 mm
2
.
INSTALLATION electrical connection
generator right
generator left
generator right
generator left
generator right
generator left
65


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for ATAG HI 6171 T at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of ATAG HI 6171 T in the language / languages: English, German, Dutch, French as an attachment in your email.

The manual is 2,25 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info