541382
19
Zoom out
Zoom in
Previous page
1/47
Next page
iDR-8 User Guide 19
Accessing the iDR-8 Setup Menus
Before your PC can take control of the iDR-8 you need to set
up its unit name and communication settings. This is done
using a simple front panel menu system. Once communication
is established between the PC and iDR-8 you use the iDR
System Manager software to configure and control the unit.
To access the menus If it is already fitted, first remove the
iDR-8 face plate by removing the 4 corner screws using the
2mm hex driver provided. This exposes the menu access keys.
Navigating the menus Press and hold the MENU key for 2
seconds until ‘***Setup***’ is displayed. Press the U and V
keys to scroll through the available menu options. Each menu
is numbered ‘*N.n’ where ‘N’ is the main menu number, and
‘n’ the sub menu. When you find the menu you want, press
ENTER. Press the U and V keys to change the value. Press
the Z ENTER and Y ESC keys to accept or decline the
changes and navigate through the sub menus. Always press
ENTER to save your changes. When you are finished, press
ESC to exit the menus.
Changing the Unit Name
The iDR-8 is identified to the PC or network by its unit name.
This name is displayed in the list of available units when you
open a new iDR System Manager session.
To change the unit name select menu item *4 Unit Name.
Scroll through each character using the Z ENTER and Y ESC
keys, and change the value using the U and V keys. The
name can have up to 16 characters.
Checking the Current Settings and Status
Select menu *8 Diagnostics. Scroll through the various sub
menus to view the settings.
Menu *8.1 and 8.2* display the last current IP address and
Subnet Mask. Make a note of these if you need to restore them
later. Note that the address shown is likely to be temporary if
the unit is working with a DHCP server.
The ‘Num Connects’ item displays the number of connections
active via the NETWORK port. For example, an iDR-8
connected to a network with two PCs both running an active
session of iDR System Manager would report 2 connections. It
is a useful way of checking to see if the unit is being accessed.
The other information displayed includes the sampling rate,
either 48 or 96kHz, which audio expanders are connected, and
the number of remote devices connected to the PL-Anet port.
Rebooting the iDR-8
It is necessary to reboot the iDR-8 if you make changes to the
network or PPP settings. You can do this two ways.
Power the unit off, then back on again, or
Press and then release the front panel CODE UPDATE switch.
This takes around a minute as the unit searches but does not
find update code. It reboots after the update search has timed
out. Note that the code is not updated in this case.
scroll
<
<
ESC ENTER
>
MENU
network setup
day & clock
diagnostics
patch select
audio monitor
hold for 2 seconds
*** Setup ***
*1 Patch Select
*** Setup ***
*4 Unit Name
*** Setup ***
*8 Diagnostics
To avoid any unexpected audible clicks
or thumps always turn connected power
amplifiers down or off before switching the
iDR-8 or any other signal equipment on or off.
19


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Allen-Heath iDR-8 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Allen-Heath iDR-8 in the language / languages: English as an attachment in your email.

The manual is 6,46 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info