473798
95
Zoom out
Zoom in
Previous page
1/132
Next page
Protect PV.500 Installation and Start-up
80000031353 BAL 7 of 20
i
Compliance with the requirements of IEC 60364-7-729 is
mandatory when installing the system.
Make sure that there is a space of at least 500 mm in
front of the system (ensure compliance with national re-
quirements, which may be different) when its doors are
open to ensure an escape route.
There must be a minimum clearance of 400 mm above
the system to allow air to escape.
Insufficient dissipation of waste heat can damage the
system!
Î Dissipate the waste heat in accordance with the manu-
facturer's specifications.
4.4 Using a Crane to Transport and Install the System
Risk of accident due to suspended loads!
Possibility of death or very serious injury.
Î Only trained personnel working specifically in the area
of transport may transport the system.
Î Secure the danger zone.
Î Never stand under suspended loads.
Î Make sure that nobody stands under suspended loads.
Î Wear personal protective equipment.
Preparations
Please note the following before transport:
z During crane transport, only use the transport rails (1) (optional)
intended for this purpose.
z Only use ropes which allow an angle of at least 45° between
rope and cabinet roof.
z Do not exceed the permissible load-bearing capacity of each
rope. The load-bearing capacity must be dimensioned as fol-
lows:
Load-bearing capacity per rope 0.5 x total weight of sys-
tem or of individual components
The total weight of the system or of the individual components
is specified in the technical data sheet.
z Do not exceed the permissible weight that can be carried by the
crane.
z Use one rope per transport eyelet.
z Be aware of the system's centre of gravity.
ATTENTION
WARNING
95


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for AEG Protect PV 500 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of AEG Protect PV 500 in the language / languages: English as an attachment in your email.

The manual is 1,99 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of AEG Protect PV 500

AEG Protect PV 500 User Manual - German - 136 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info