473798
93
Zoom out
Zoom in
Previous page
1/132
Next page
Protect PV.500 Installation and Start-up
80000031353 BAL 5 of 20
4 Transport, Storage and Installation
4.1 Packing
The system or the individual control cabinets are fastened to
transport pallets and packed at the factory to withstand both rail
and road transport. The system or the individual control cabinets
are packed in plastic film to prevent any damage to the surface
paint and to protect against moisture.
4.2 Storage
Only store the system or the individual control cabinets for a
maximum period of six months in the original packaging in dry,
ventilated rooms with a permanent roof. The permissible ambient
temperature range is between -35°C and +70°C with a relative
humidity of 85%.
If the system or the individual control cabinets are stored for longer
than six months, they must first be packed with standard desic-
cants and then sealed in airtight plastic film.
i
To prevent damage, only remove the protective film from
the system or the individual control cabinets immediately
prior to installation..
4.3 Installation Site Requirements, Operating Area
The system is intended for installation in areas which are difficult to
access.
The system is intended for operation in a station (container) by de-
fault. The system must be installed in such a way that the supply
air and exhaust air ducts can ensure sufficient cooling of the INV
control cabinet. Access must facilitate replacement of the fans and
opening of the cleaning flap.
If the system is not operated in a wall-mounted station, additional
measures must be taken to ensure that there is sufficient cooling
of the INV control cabinet in particular and that the exhaust air
cannot get back in through the supply air openings.
Suitable floor surfaces for installation of the system are:
Double floors
Above cable ducts
Directly on a level surface
Î Ensure that the weight of the system does not exceed the
maximum floor bearing capacity.
Î Observe the applicable fire protection requirements.
93


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for AEG Protect PV 500 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of AEG Protect PV 500 in the language / languages: English as an attachment in your email.

The manual is 1,99 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of AEG Protect PV 500

AEG Protect PV 500 User Manual - German - 136 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info